3.4  Unloading Space

In

 

order

 

to

 

select

 

the

 

correct

 

type

 

of

 

truck

 

to

 

deliver

 

the

 

printer,

 

the

 

presence

 

or

 

absence

 

of

 

a

 

loading

 

dock

 

at

 

the

 

customer

 

site

 

must

 

be

 

identified.

Check

 

the

 

route

 

from

 

the

 

unloading

 

location

 

to

 

the

 

installation

 

location

 

and

 

make

 

sure

 

there

 

are

 

no

 

obstructions.

3.5  Unloading Assistance

The

 

customer

 

must

 

provide

 

professional

 

unloaders

 

to

 

unload

 

the

 

pallets

 

and

 

transfer

 

them

 

to

 

the

 

site.

 

The

 

unloaders

 

will

 

assist

 

the

 

distributor’s

 

personnel

 

in

 

unpacking

 

the

 

equipment.

3.6  Training

After

 

the

 

installation

 

of

 

the

 

3

D

 

printing

 

system,

 

an

 

authorized

 

Stratasys

 

customer

 

support

 

engineer

 

will

 

train

 

an

 

operator

 

and

 

supervise

 

the

 

operation

 

of

 

the

 

printer

 

(1½

 

work

 

days).

 

The

 

printer

 

operator

 

needs

 

to

 

be

 

available

 

during

 

the

 

entire

 

installation

 

and

 

training

 

period—two

 

work

 

days.

Summary of Contents for OBJ-14000

Page 1: ...Stratasys Confidential and Proprietary Information Objet Desktop 3 D Printer Site Preparation Guide Rev D2 DOC 04002...

Page 2: ...stored in a database or retrieval system without prior permission in writing from Stratasys Ltd If this document is distributed as a PDF file you may print it for internal use February 2013 DOC 04002...

Page 3: ...8 3 3 Equipment 8 3 4 Unloading Space 9 3 5 Unloading Assistance 9 3 6 Training 9 4 Site Requirements 4 1 Floor Area 10 4 2 Table Height Strength 11 4 3 Clear Space Above the Printer 11 4 4 Doors and...

Page 4: ...Objet Desktop 3 D Printer Site Preparation Guide DOC 04002 4 Rev D2 5 11 Storage of Printing Materials 18 5 12 Fire Control 19 Site Preparation Checklist 20...

Page 5: ...n activities must be completed before the installation date it is important for the customer to read this guide thoroughly and to complete the Customer Site Preparation Checklist at the end of this gu...

Page 6: ...bjet 3 D printer 2 2 Size and Weight The following table shows the size and weight information for the printer 2 3 Start Up Kit The printer comes equipped with a start up kit which includes tools and...

Page 7: ...atula and a loupe for regular operation and maintenance The tools are kept in a special pouch Consumable items wiping cloths pink paper transparencies and so on to maintain the printer for approximate...

Page 8: ...atasys certified Customer Support Engineers will advise the customer on site preparation upon request 3 2 Shipping Pallets The printer arrives on a wooden pallet The pallet s approximate size and weig...

Page 9: ...re are no obstructions 3 5 Unloading Assistance The customer must provide professional unloaders to unload the pallets and transfer them to the site The unloaders will assist the distributor s personn...

Page 10: ...for loading materials and removing printed models 4 1 Floor Area For convenience Stratasys recommends that you place the printer on a stable table or stand with lockable wheels You can order a printer...

Page 11: ...use must be USB type devices Shelves and cabinets may be located in the vicinity of the printer to allow convenient storage of tools parts accessories manuals and containers or model support material...

Page 12: ...oors and Hallways A minimum width of 65 cm 2 feet 2 inches is required for the printer to pass through 90 cm 3 feet when the shipping pallet is included If the printer must be turned for example to en...

Page 13: ...directly from the main electrical panel without any tapped feeds on the line 5 1 2 Grounding The printer is grounded through a single phase AC plug Make sure that the ground connection in the wall out...

Page 14: ...have a USB alert output for graceful system shutdown Do not use a UPS device which only has a Serial Com signal output RS 232 Protocol 5 2 2 Specifications Refer to the relevant voltage below when sel...

Page 15: ...Service Pack 2 Microsoft Vista Microsoft Windows 7 Professional Ultimate and Enterprise versions only Macintosh operating systems are not supported Graphics Card Supporting Open GL 512 MB of memory Se...

Page 16: ...equired near the server workstation Figure 5 1 Network connection 5 7 Heat Dissipation Table 7 describes the heat dissipation of the system units Objet 3 D printing system Crossed Network Cable 5 m 16...

Page 17: ...where the printing system is operated see section 5 8 2 The ventilation system should have the capacity to replace all of the air in the room four times an hour 5 9 Waste Disposal for Model Support M...

Page 18: ...inting materials should be stored in conformance with applicable fire department and insurance company regulations and other applicable laws regulations codes and guidelines 5 11 2 Shelf Life Printing...

Page 19: ...19 Rev D2 5 12 Fire Control A gas fire extinguisher should be used in case of fire in or near the system Other extinguishers are also acceptable but the use of liquid fire extinguishers must be avoid...

Page 20: ...ed engineer if you have any questions related to the checklist and its implementation Please be aware that Stratasys technical staff will not be able to arrive on site for installation and train ing u...

Page 21: ...or area and strength section 4 1 Room layout section 4 1 Access to final site doors hallways etc section 4 4 Electrical power supply and outlets sections 5 1 1 5 1 3 Circuit breaker section 5 1 1 Grou...

Reviews: