Stratasys OBJ-14000 Site Preparation Manual Download Page 14

Objet Desktop 3-D Printer Site Preparation Guide

DOC-04002

14

Rev. D2

The

 

following

 

wall

 

outlets

 

are

 

required:

• One

 

wall

 

outlet

 

behind

 

the

 

printer

 

(for

 

the

 

printer)

This 

should

 

be

 

connected

 

directly

 

to

 

the

 

main

 

electrical

 

panel.

• Three

 

wall

 

outlets

 

close

 

to

 

the

 

printer

 

(for

 

the

 

printer

server

 

workstation,

 

the

 

monitor,

 

and

 

an

 

extra

 

one

 

for

 

servicing

 

requirements)

5.2  Uninterruptible Power Supply (UPS)

To

 

avoid

 

printing

 

problems

 

due

 

to

 

power

 

outages

 

and

 

other

 

power

 

problems,

 

it

 

is

 

recommended

 

that

 

the

 

customer

 

install

 

equipment

 

that

 

ensures

 

a

 

continuous

 

power

 

supply,

 

with

 

the

 

following

 

functionality

 

and

 

specifications.

5.2.1  Functionality

The

 

device

 

used

 

must

 

have

 

a

 

USB

 

alert

 

output

 

for

 

“graceful

 

system

 

shutdown.”

 

(Do

 

not

 

use

 

a

 

UPS

 

device

 

which

 

only

 

has

 

a

 

Serial

 

Com

 

signal

 

output—RS

232

 

Protocol.)

5.2.2  Specifications

Refer

 

to

 

the

 

relevant

 

voltage

 

below

 

when

 

selecting

 

a

 

UPS:

5.3  Communication Lines

A

 

telephone

 

line,

 

for

 

general

 

communication

 

and

 

service

 

calls,

 

is

 

recommended

 

near

 

the

 

system

 

(in

 

close

 

proximity

 

to

 

the

 

printer).

Voltage

Current

Power

100–120 VAC, 50–60 Hz

16 Amps

1500 VA for 20 minutes

200–240 VAC, 50–60 Hz

8 Amps

1500 VA for 20 minutes

Table 5: UPS requirements

To provide adequate protection if a power failure occurs, the UPS requirements 
are calculated to supply about 20% more than the printer’s power rating, shown in 
section 5.1.1 on page 13, for the estimated time it may take to shut your system 
down in a controlled manner. The UPS device recommended is not intended to let 
you continue working.

Summary of Contents for OBJ-14000

Page 1: ...Stratasys Confidential and Proprietary Information Objet Desktop 3 D Printer Site Preparation Guide Rev D2 DOC 04002...

Page 2: ...stored in a database or retrieval system without prior permission in writing from Stratasys Ltd If this document is distributed as a PDF file you may print it for internal use February 2013 DOC 04002...

Page 3: ...8 3 3 Equipment 8 3 4 Unloading Space 9 3 5 Unloading Assistance 9 3 6 Training 9 4 Site Requirements 4 1 Floor Area 10 4 2 Table Height Strength 11 4 3 Clear Space Above the Printer 11 4 4 Doors and...

Page 4: ...Objet Desktop 3 D Printer Site Preparation Guide DOC 04002 4 Rev D2 5 11 Storage of Printing Materials 18 5 12 Fire Control 19 Site Preparation Checklist 20...

Page 5: ...n activities must be completed before the installation date it is important for the customer to read this guide thoroughly and to complete the Customer Site Preparation Checklist at the end of this gu...

Page 6: ...bjet 3 D printer 2 2 Size and Weight The following table shows the size and weight information for the printer 2 3 Start Up Kit The printer comes equipped with a start up kit which includes tools and...

Page 7: ...atula and a loupe for regular operation and maintenance The tools are kept in a special pouch Consumable items wiping cloths pink paper transparencies and so on to maintain the printer for approximate...

Page 8: ...atasys certified Customer Support Engineers will advise the customer on site preparation upon request 3 2 Shipping Pallets The printer arrives on a wooden pallet The pallet s approximate size and weig...

Page 9: ...re are no obstructions 3 5 Unloading Assistance The customer must provide professional unloaders to unload the pallets and transfer them to the site The unloaders will assist the distributor s personn...

Page 10: ...for loading materials and removing printed models 4 1 Floor Area For convenience Stratasys recommends that you place the printer on a stable table or stand with lockable wheels You can order a printer...

Page 11: ...use must be USB type devices Shelves and cabinets may be located in the vicinity of the printer to allow convenient storage of tools parts accessories manuals and containers or model support material...

Page 12: ...oors and Hallways A minimum width of 65 cm 2 feet 2 inches is required for the printer to pass through 90 cm 3 feet when the shipping pallet is included If the printer must be turned for example to en...

Page 13: ...directly from the main electrical panel without any tapped feeds on the line 5 1 2 Grounding The printer is grounded through a single phase AC plug Make sure that the ground connection in the wall out...

Page 14: ...have a USB alert output for graceful system shutdown Do not use a UPS device which only has a Serial Com signal output RS 232 Protocol 5 2 2 Specifications Refer to the relevant voltage below when sel...

Page 15: ...Service Pack 2 Microsoft Vista Microsoft Windows 7 Professional Ultimate and Enterprise versions only Macintosh operating systems are not supported Graphics Card Supporting Open GL 512 MB of memory Se...

Page 16: ...equired near the server workstation Figure 5 1 Network connection 5 7 Heat Dissipation Table 7 describes the heat dissipation of the system units Objet 3 D printing system Crossed Network Cable 5 m 16...

Page 17: ...where the printing system is operated see section 5 8 2 The ventilation system should have the capacity to replace all of the air in the room four times an hour 5 9 Waste Disposal for Model Support M...

Page 18: ...inting materials should be stored in conformance with applicable fire department and insurance company regulations and other applicable laws regulations codes and guidelines 5 11 2 Shelf Life Printing...

Page 19: ...19 Rev D2 5 12 Fire Control A gas fire extinguisher should be used in case of fire in or near the system Other extinguishers are also acceptable but the use of liquid fire extinguishers must be avoid...

Page 20: ...ed engineer if you have any questions related to the checklist and its implementation Please be aware that Stratasys technical staff will not be able to arrive on site for installation and train ing u...

Page 21: ...or area and strength section 4 1 Room layout section 4 1 Access to final site doors hallways etc section 4 4 Electrical power supply and outlets sections 5 1 1 5 1 3 Circuit breaker section 5 1 1 Grou...

Reviews: