Stratasys OBJ-14000 Site Preparation Manual Download Page 17

Objet Desktop 3-D Printer Site Preparation Guide

DOC-04002

17

Rev. D2

5.8  Air Conditioning

Room

 

air

 

conditioning

 

must

 

be

 

designed

 

so

 

that

 

the

 

temperature

 

and

 

humidity

 

specifications

 

described

 

below

 

are

 

maintained

 

when

 

the

 

system

 

operates

 

at

 

full

 

power.

5.8.1  Temperature

The

 

temperature

 

in

 

the

 

room

 

containing

 

the

 

printing

 

system

 

should

 

be

 

18°

 

C

 

to

 

25°

 

C

 

(64.5°

 

F

 

to

 

77°

 

F).

5.8.2  Humidity

The

 

relative

 

humidity

 

in

 

the

 

room

 

containing

 

the

 

printer

 

should

 

be

 

30%–70%

 

non

condensing.

 

The

 

room

 

requires

 

constant

 

refreshing

 

of

 

the

 

humid

 

air

 

by

 

appropriate

 

ventilation

 

units

 

(refer

 

to

 

Section

 

5.8.3,

 

Ventilation).

5.8.3  Ventilation

Ventilation

 

is

 

required

 

to

 

maintain

 

the

 

necessary

 

environment

 

conditions

 

in

 

the

 

room

 

where

 

the

 

printing

 

system

 

is

 

operated

 

(see

 

section

 

5.8.2).

 

The

 

ventilation

 

system

 

should

 

have

 

the

 

capacity

 

to

 

replace

 

all

 

of

 

the

 

air

 

in

 

the

 

room

 

four

 

times

 

an

 

hour.

5.9  Waste Disposal (for Model/Support Material)

The

 

customer

 

is

 

responsible

 

for

 

disposing

 

all

 

of

 

the

 

liquid

 

and

 

solid

 

waste

 

according

 

to

 

local

 

laws

 

and

 

regulations.

 

This

 

waste

 

also

 

includes

 

the

 

following:

• Wipes

 

and

 

gloves

 

used

 

for

 

cleaning

 

the

 

printer

• Printing

 

material

 

cartridges

5.10  Solvent/Cleaning Solution

The

 

customer

 

is

 

responsible

 

for

 

stocking

 

either

 

isopropanol

 

or

 

ethanol

 

(>96%).

 

At

 

least

 

one

 

liter

 

of

 

either

 

solvent

 

should

 

be

 

available

 

at

 

the

 

site

 

at

 

all

 

times.

The printer evacuates air using an internal blower with a capacity of 106 CFM 
(cubic feet per minute) (180 m

3

 per hour).

Plastic containers made from monomer-soluble materials such as polystyrene or 
polyvinyl chloride should not be used for the storage of 3-D printer waste.

Summary of Contents for OBJ-14000

Page 1: ...Stratasys Confidential and Proprietary Information Objet Desktop 3 D Printer Site Preparation Guide Rev D2 DOC 04002...

Page 2: ...stored in a database or retrieval system without prior permission in writing from Stratasys Ltd If this document is distributed as a PDF file you may print it for internal use February 2013 DOC 04002...

Page 3: ...8 3 3 Equipment 8 3 4 Unloading Space 9 3 5 Unloading Assistance 9 3 6 Training 9 4 Site Requirements 4 1 Floor Area 10 4 2 Table Height Strength 11 4 3 Clear Space Above the Printer 11 4 4 Doors and...

Page 4: ...Objet Desktop 3 D Printer Site Preparation Guide DOC 04002 4 Rev D2 5 11 Storage of Printing Materials 18 5 12 Fire Control 19 Site Preparation Checklist 20...

Page 5: ...n activities must be completed before the installation date it is important for the customer to read this guide thoroughly and to complete the Customer Site Preparation Checklist at the end of this gu...

Page 6: ...bjet 3 D printer 2 2 Size and Weight The following table shows the size and weight information for the printer 2 3 Start Up Kit The printer comes equipped with a start up kit which includes tools and...

Page 7: ...atula and a loupe for regular operation and maintenance The tools are kept in a special pouch Consumable items wiping cloths pink paper transparencies and so on to maintain the printer for approximate...

Page 8: ...atasys certified Customer Support Engineers will advise the customer on site preparation upon request 3 2 Shipping Pallets The printer arrives on a wooden pallet The pallet s approximate size and weig...

Page 9: ...re are no obstructions 3 5 Unloading Assistance The customer must provide professional unloaders to unload the pallets and transfer them to the site The unloaders will assist the distributor s personn...

Page 10: ...for loading materials and removing printed models 4 1 Floor Area For convenience Stratasys recommends that you place the printer on a stable table or stand with lockable wheels You can order a printer...

Page 11: ...use must be USB type devices Shelves and cabinets may be located in the vicinity of the printer to allow convenient storage of tools parts accessories manuals and containers or model support material...

Page 12: ...oors and Hallways A minimum width of 65 cm 2 feet 2 inches is required for the printer to pass through 90 cm 3 feet when the shipping pallet is included If the printer must be turned for example to en...

Page 13: ...directly from the main electrical panel without any tapped feeds on the line 5 1 2 Grounding The printer is grounded through a single phase AC plug Make sure that the ground connection in the wall out...

Page 14: ...have a USB alert output for graceful system shutdown Do not use a UPS device which only has a Serial Com signal output RS 232 Protocol 5 2 2 Specifications Refer to the relevant voltage below when sel...

Page 15: ...Service Pack 2 Microsoft Vista Microsoft Windows 7 Professional Ultimate and Enterprise versions only Macintosh operating systems are not supported Graphics Card Supporting Open GL 512 MB of memory Se...

Page 16: ...equired near the server workstation Figure 5 1 Network connection 5 7 Heat Dissipation Table 7 describes the heat dissipation of the system units Objet 3 D printing system Crossed Network Cable 5 m 16...

Page 17: ...where the printing system is operated see section 5 8 2 The ventilation system should have the capacity to replace all of the air in the room four times an hour 5 9 Waste Disposal for Model Support M...

Page 18: ...inting materials should be stored in conformance with applicable fire department and insurance company regulations and other applicable laws regulations codes and guidelines 5 11 2 Shelf Life Printing...

Page 19: ...19 Rev D2 5 12 Fire Control A gas fire extinguisher should be used in case of fire in or near the system Other extinguishers are also acceptable but the use of liquid fire extinguishers must be avoid...

Page 20: ...ed engineer if you have any questions related to the checklist and its implementation Please be aware that Stratasys technical staff will not be able to arrive on site for installation and train ing u...

Page 21: ...or area and strength section 4 1 Room layout section 4 1 Access to final site doors hallways etc section 4 4 Electrical power supply and outlets sections 5 1 1 5 1 3 Circuit breaker section 5 1 1 Grou...

Reviews: