Stratasys OBJ-14000 Site Preparation Manual Download Page 5

Objet Desktop 3-D Printer Site Preparation Guide

DOC-04002

5

Rev. D2

1  Introduction

1.1  About this Guide

This

 

document

 

provides

 

site

 

preparation

 

information

 

and

 

requirements

 

for

 

your

 

Objet

 

3

D

 

printing

 

system

 

to

 

ensure

 

proper

 

installation

 

and

 

operation.

 

The

 

customer

 

is

 

responsible

 

for

 

preparing

 

the

 

installation

 

site

 

according

 

to

 

the

 

instructions

 

and

 

guidelines

 

described

 

in

 

this

 

document.

The

 

following

 

topics

 

are

 

covered

 

in

 

this

 

guide:

• Physical

 

Description

• Shipment

 

and

 

Delivery

• Site

 

Requirements

• Facility

 

Requirements

• Site

 

Preparation

 

Checklist

Important:

Since

 

site

 

preparation

 

activities

 

must

 

be

 

completed

 

before

 

the

 

installation

 

date,

 

it

 

is

 

important

 

for

 

the

 

customer

 

to

 

read

 

this

 

guide

 

thoroughly

 

and

 

to

 

complete

 

the

 

Customer

 

Site

 

Preparation

 

Checklist

 

at

 

the

 

end

 

of

 

this

 

guide.

 

On

 

completion,

 

the

 

checklist

 

should

 

be

 

faxed

 

to

 

customer’s

 

Stratasys contac  

t

 

person.

For

 

special

 

operating

 

conditions

 

or

 

if

 

you

 

have

 

any

 

questions

 

about

 

the

 

site

 

preparation

 

procedure,

 

contact

 

your

 

local

 

Stratasys 

representative.

1.2  Installation and Training

Installation

 

and

 

training

 

take

 

two

 

work

 

days:

• Basic

 

installation

 

and

 

adjustment—

These

 

procedures

 

are

 

described

 

in

 

the

 

printer

 

Installation

 

Guides—

Objet24/30

 

printers:

 

DOC

14040

Alaris30

 

printers:

 

DOC

04006

• Operator

 

training

 

including

 

practice

 

under

 

supervision—

Covers

 

the

 

operation

 

and

 

maintenance

 

of

 

the

 

Objet

 

Desktop.

Summary of Contents for OBJ-14000

Page 1: ...Stratasys Confidential and Proprietary Information Objet Desktop 3 D Printer Site Preparation Guide Rev D2 DOC 04002...

Page 2: ...stored in a database or retrieval system without prior permission in writing from Stratasys Ltd If this document is distributed as a PDF file you may print it for internal use February 2013 DOC 04002...

Page 3: ...8 3 3 Equipment 8 3 4 Unloading Space 9 3 5 Unloading Assistance 9 3 6 Training 9 4 Site Requirements 4 1 Floor Area 10 4 2 Table Height Strength 11 4 3 Clear Space Above the Printer 11 4 4 Doors and...

Page 4: ...Objet Desktop 3 D Printer Site Preparation Guide DOC 04002 4 Rev D2 5 11 Storage of Printing Materials 18 5 12 Fire Control 19 Site Preparation Checklist 20...

Page 5: ...n activities must be completed before the installation date it is important for the customer to read this guide thoroughly and to complete the Customer Site Preparation Checklist at the end of this gu...

Page 6: ...bjet 3 D printer 2 2 Size and Weight The following table shows the size and weight information for the printer 2 3 Start Up Kit The printer comes equipped with a start up kit which includes tools and...

Page 7: ...atula and a loupe for regular operation and maintenance The tools are kept in a special pouch Consumable items wiping cloths pink paper transparencies and so on to maintain the printer for approximate...

Page 8: ...atasys certified Customer Support Engineers will advise the customer on site preparation upon request 3 2 Shipping Pallets The printer arrives on a wooden pallet The pallet s approximate size and weig...

Page 9: ...re are no obstructions 3 5 Unloading Assistance The customer must provide professional unloaders to unload the pallets and transfer them to the site The unloaders will assist the distributor s personn...

Page 10: ...for loading materials and removing printed models 4 1 Floor Area For convenience Stratasys recommends that you place the printer on a stable table or stand with lockable wheels You can order a printer...

Page 11: ...use must be USB type devices Shelves and cabinets may be located in the vicinity of the printer to allow convenient storage of tools parts accessories manuals and containers or model support material...

Page 12: ...oors and Hallways A minimum width of 65 cm 2 feet 2 inches is required for the printer to pass through 90 cm 3 feet when the shipping pallet is included If the printer must be turned for example to en...

Page 13: ...directly from the main electrical panel without any tapped feeds on the line 5 1 2 Grounding The printer is grounded through a single phase AC plug Make sure that the ground connection in the wall out...

Page 14: ...have a USB alert output for graceful system shutdown Do not use a UPS device which only has a Serial Com signal output RS 232 Protocol 5 2 2 Specifications Refer to the relevant voltage below when sel...

Page 15: ...Service Pack 2 Microsoft Vista Microsoft Windows 7 Professional Ultimate and Enterprise versions only Macintosh operating systems are not supported Graphics Card Supporting Open GL 512 MB of memory Se...

Page 16: ...equired near the server workstation Figure 5 1 Network connection 5 7 Heat Dissipation Table 7 describes the heat dissipation of the system units Objet 3 D printing system Crossed Network Cable 5 m 16...

Page 17: ...where the printing system is operated see section 5 8 2 The ventilation system should have the capacity to replace all of the air in the room four times an hour 5 9 Waste Disposal for Model Support M...

Page 18: ...inting materials should be stored in conformance with applicable fire department and insurance company regulations and other applicable laws regulations codes and guidelines 5 11 2 Shelf Life Printing...

Page 19: ...19 Rev D2 5 12 Fire Control A gas fire extinguisher should be used in case of fire in or near the system Other extinguishers are also acceptable but the use of liquid fire extinguishers must be avoid...

Page 20: ...ed engineer if you have any questions related to the checklist and its implementation Please be aware that Stratasys technical staff will not be able to arrive on site for installation and train ing u...

Page 21: ...or area and strength section 4 1 Room layout section 4 1 Access to final site doors hallways etc section 4 4 Electrical power supply and outlets sections 5 1 1 5 1 3 Circuit breaker section 5 1 1 Grou...