Introduction
About this Guide
The information and requirements provided in this document ensure proper installation and operation of
the Stratasys J826 printing system. The customer is responsible for preparing the site as described in this
document, and according to any applicable local regulations.
If you have any questions about the information in this document, contact your Stratasys representative.
All site requirements must be met before the installation date. The Site Preparation Checklist should be
submitted to your Stratasys representative. Shipping will be arranged after the checklist is received by
Stratasys.
Non-compliance with requirements specified in this document may result in additional installation
charges.
Installation and Training Schedule
•
Basic installation and adjustment: 1 work day
•
Operator training (operation and maintenance): 1 work day
•
Product designer training (advanced features and work flow): ½ work day
•
Practice under supervision: 1½ work days
Stratasys J826
Introduction
DOC-18005 Rev. E
©
2019-2020 Stratasys. All rights reserved.
5