Take care that the Screens are
not obstructed with plant ma-
terial. To guarantee optimal re-
sults, we recommend cleaning the
Screens after each vaporization cycle
with the enclosed Cleaning Brush.
Put the Filling Chamber with Cap on the
hot air outlet of the Hot Air Generator
and allow it to lock in place. Switch on
the air pump. To do so, press the green
button/switch labeled “AIR“. The Filling
Chamber as well as the vaporization
material must be preheated for a cou-
ple of seconds before the aromas and
fragrances start to vaporize. Before at-
taching, remove the Mouthpiece from
the Valve Balloon.
8. E A SY VA LV E
Preheat plant material for a few seconds
approx. 5 sec
Stretch
Valve Balloon
tight
Before putting the Valve Bal-
loon on the Filling Chamber,
stretch it tight so that the Bal-
loon is placed vertically on the Hot Air
Generator when it is Elled.
Put the Valve Balloon on the Filling
Chamber and allow it to lock in place.
This will open the Valve. Now the Valve
Balloon will Ell with vapor.
Only Ell the Valve Balloon with the ap
-
proximate amount of vapor that you in-
tend to use within the next 10 minutes.
Do not Ell the Valve Balloon completely
(overpressure) in order to prevent the
loss of vapor. It is important to observe
65
en
fr
es
it
nl
de