Strikemaster ES
Engineering
Manual
Strikemaster ES Engineering Manual Page 8 of 8 For more information visit
www.storm-interface.com
Rev 2 March 2015
© Copyright Storm Interface. 2014. All rights reserved
Power Up & Controller Setup
Mains Power Up
Apply mains power.
Check green Mains LED
is on. (The diagram below shows all the connections on the FPO75, not all are used).
Disconnect mains power
Standby Battery
If using a standby battery, connect a 12V lead-acid rechargeable battery using the battery leads supplied.
Ensure the battery polarity is correct (red is +ve, black is –ve).
Please note: if the battery is partially charged, the controller might now be powered. Green LED 19 will be on.
Apply mains power (Green LED
will be on) and check there is no fault indication on LED
.
After a few minutes, disconnect mains power and ensure that the controller remains powered from the battery
Controller Setup
Once you have fitted the keypad / door lock / exit switch you can program the controller.
Make sure the keypad is fitted to the backbox (otherwise it will tamper when you try to program)
Press the program switch on the controller board (LED will flash), and set a new Engineer Code.
Keep a record of the Engineer Code
Program entry codes and lock operation via the Door A connector (either locally or from Door A keypad outside)