background image

 

 

 

C—ROOF COVER INSTALLATION 

NOTE:  DO  NOT 

install  the  cover  onto  the  frame  of  your  building  in  high  wind  conditions.  A 

slight breeze is the most advantageous for cover installation. To take advantage of the breeze,  pull 
the cover up over the arches with breeze blowing in the cover like a sail filled with air. 

1.

 

Assemble Tensioning Tube for Roof Cover (No.10) before installing the cover. 

2.

 

Put the Roof Cover (No. 13) EVENLY, CAREFULLY AND SLOWLY on the frame. Adjust 
the cover so that it is square and evenly centered on the frame. 

 

 

Figure  5 

Summary of Contents for C4040S

Page 1: ...SHELTER ASSEMBLY MANUAL Model W12xL12xH 4 5m C4040S Container Shelter...

Page 2: ...bility to take of snow immediately if not slide off by itself READ ALL INSTRUCTIONS BEFORE ASSEMBLY 1 Keep work area clean Cluttered areas invite injuries Do not set up near snow drifts in slippery pl...

Page 3: ...n Device 16 6 Clips 32 7A Left Base Plate 6 7B Right Base Plate 6 8 Ratchet 12 9 Nylon band for ratchet 12 10 Tensioning Tube 2 11 Bolts M8x80 96 12 Bolts M10x80 42 13 Roof Cover 1 14 Knitting Rope fo...

Page 4: ...s INSTALLATION PROCESS A BASE INSTALLATION Please refer to the diagram Figure 1 to place the base plates Figure 1 1 The measurement is from center to center of the tubes Referring to the above diagram...

Page 5: ...4 Figure 2 Sketch Frame...

Page 6: ...e No 3 To connect them by Bolts M8x80 No 11 Which makes one group of arch Please NOTE the direction of the bolt DO NOT install the bolts on the top of the truss where the fabric will rest 2 Insert one...

Page 7: ...purlins onto them by using screw M10x80 No 12 There are 7 pieces of Connection Purlins No 4 between each arch Then install the third arch into base plate and connect the purlins Finally install the To...

Page 8: ...installation To take advantage of the breeze pull the cover up over the arches with breeze blowing in the cover like a sail filled with air 1 Assemble Tensioning Tube for Roof Cover No 10 before inst...

Page 9: ...ats 4 Cut pockets over each ratchet on the base plates and put the Tensioning Tube for roof cover No 10 into the pocket of roof cover Then use the Nylon band No 9 to tie down the Lower Tensioning Tube...

Page 10: ...mbly and tightening has been completed The process is quite easy But some tightening adjustments will be necessary to produce a flat tensioned roof cover Please adjust the roof cover every month Pleas...

Reviews: