3
EQUIPEMNT AND TOOLS FOR INSTALIATION
1.
Measuring tape
2.
String for alignment
3.
Step ladder
4.
Welder
5.
Sledge hammer
6.
Wrench
7.
Scissors
INSTALLATION PROCESS
A—BASE INSTALLATION
Please refer to the diagram (Figure 1) to place the base plates.
Figure 1
1.
The measurement is from center to center of the tubes. Referring to the above diagram and
confirm the place of the base plates. ENSURE THAT THE FOUNDATIONS IS SQUARE.
2.
All the base plates should be welded on the Containers.