background image

 

 

Parts List 

Part Code 

Description 

Qty 

Top Bent Tube 

Side Bent Tube 

12 

Lower Bent Tube 

12 

Purlin 

35 

Top Tension Device 

16 

Clips 

32 

7A 

Left Base Plate 

7B 

Right Base Plate 

Ratchet 

12 

Nylon band for ratchet 

12 

10 

Tensioning Tube 

 

11 

Bolts M8x80 

96 

12 

Bolts M10x80 

42 

13 

Roof Cover 

14 

Knitting Rope for Cover 

15 

32 Plastic Plug for end of tensioning tube 

16 

Angle iron 

17 

Angle iron for base plate 

12 

18 

Bolt 12x30 

60 

Summary of Contents for C4040S

Page 1: ...SHELTER ASSEMBLY MANUAL Model W12xL12xH 4 5m C4040S Container Shelter...

Page 2: ...bility to take of snow immediately if not slide off by itself READ ALL INSTRUCTIONS BEFORE ASSEMBLY 1 Keep work area clean Cluttered areas invite injuries Do not set up near snow drifts in slippery pl...

Page 3: ...n Device 16 6 Clips 32 7A Left Base Plate 6 7B Right Base Plate 6 8 Ratchet 12 9 Nylon band for ratchet 12 10 Tensioning Tube 2 11 Bolts M8x80 96 12 Bolts M10x80 42 13 Roof Cover 1 14 Knitting Rope fo...

Page 4: ...s INSTALLATION PROCESS A BASE INSTALLATION Please refer to the diagram Figure 1 to place the base plates Figure 1 1 The measurement is from center to center of the tubes Referring to the above diagram...

Page 5: ...4 Figure 2 Sketch Frame...

Page 6: ...e No 3 To connect them by Bolts M8x80 No 11 Which makes one group of arch Please NOTE the direction of the bolt DO NOT install the bolts on the top of the truss where the fabric will rest 2 Insert one...

Page 7: ...purlins onto them by using screw M10x80 No 12 There are 7 pieces of Connection Purlins No 4 between each arch Then install the third arch into base plate and connect the purlins Finally install the To...

Page 8: ...installation To take advantage of the breeze pull the cover up over the arches with breeze blowing in the cover like a sail filled with air 1 Assemble Tensioning Tube for Roof Cover No 10 before inst...

Page 9: ...ats 4 Cut pockets over each ratchet on the base plates and put the Tensioning Tube for roof cover No 10 into the pocket of roof cover Then use the Nylon band No 9 to tie down the Lower Tensioning Tube...

Page 10: ...mbly and tightening has been completed The process is quite easy But some tightening adjustments will be necessary to produce a flat tensioned roof cover Please adjust the roof cover every month Pleas...

Reviews: