background image

Operators Manual #513852 Rev.2 

CBD Model Machines

SECTION 2

INSTALLATION INSTRUCTIONS

2.1 SAFETY PRECAUTIONS

Do not attempt to operate the machine until the safety 
precautions and operating instructions in this manual are 
read completely and are thoroughly understood.

Take notice of all warning labels on the machine. The la-
bels have been put there to help maintain a safe working 
environment. The labels have been designed to withstand 
washing and cleaning. All labels must remain legible for 
the life of the machine. Labels should be checked periodi-
cally to be sure they can be recognized as warning labels.

 If danger, warning or caution labels are needed, indicate 
the part number, type of label, location of label, and quantity 
required along with your address and mail to:

STOELTING, INC.

ATTENTION:  Customer Service

502 Hwy. 67

Kiel, Wisconsin  53042

2.2 SHIPMENT AND TRANSIT

The machine has been assembled, operated and inspected 
at the factory. Upon arrival at the fi nal destination, the 
entire machine must be checked for any damage which 
may have occurred during transit.

With the method of packaging used, the machine should 
arrive in excellent condition. THE CARRIER IS RESPON-
SIBLE FOR ALL DAMAGE IN TRANSIT, WHETHER 
VISIBLE OR CONCEALED. Do not pay the freight bill 
until the machine has been checked for damage. Have 
the carrier note any visible damage on the freight bill. If 
concealed damage and/or shortage is found later, advise 
the carrier within 10 days and request inspection. The 
customer must place claim for damages and/or shortages 
in shipment with the carrier. Stoelting, Inc. cannot make 
any claims against the carrier.

2.3 MACHINE INSTALLATION

Installation of the machine involves moving the machine 
close to its permanent location, removing all crating, set-
ting in place, assembling parts, and cleaning.

A. 

Uncrate the machine.

B. 

Remove the packing material and move the 
machine into place. Do not lift the machine by 
the augers or handles. Only lift by grasping the 
bottom of the machine.

C. 

Correct ventilation is required. The CBD machine 
requires 10” clearance on both sides and 12” 
clearance at the back.

D. 

Install the drip trays.

NOTE

The drip trays can be connected to a fl oor  drain. 
Punch out one of the holes at the back of the tray 
and connect tubing to the tray.

E. 

Make sure the Main Power Switch is in the Off 
position.

F. 

Connect the power cord to the proper power 
supply. Check the nameplate on on front of the 
machine for the required power supply. The 
unit must be connected to a properly grounded 
receptacle. The electrical cord furnished as part 
of the machine has a three prong grounding 
type plug. The use of an extension cord is not 
recommended, if necessary use one with a size 
12 gauge or heavier with ground wire. Do not use 
an adapter to get around grounding requirement. 

F. 

Clean and sanitize the machine before the fi rst 
use.

2.4 DEFROST TIMER

The defrost timer is available on model CBD127 and is 
located behind the right side panel. The timer can defrost 
the machine at specifi c times of the day and specifi c days 
of the week (up to 8 defrost cycles per week). During the 
defrost cycle the auger rotates and the refrigeration system 
keeps the product cold (but not frozen).

WARNING

Do not alter or deform electrical plug in any way. 
Altering the plug to fi t into an outlet of different con-
fi guration may cause fi re, risk of electrical shock, 
product damage and will void warranty.

CAUTION

Do not install the machine outdoors. Exposure to 
weather conditions or wet and damp locations can 
damage the machine 

Summary of Contents for CBD117

Page 1: ...Model CBD OPERATORS MANUAL Manual No 513852 Rev 2...

Page 2: ......

Page 3: ...PT to operate the machine until instructions and safety precautions in this manual are read completely and are thoroughly understood If problems develop or questions arise in connection with installat...

Page 4: ...ecific safety information the following safety defini tions are provided to assist the reader The purpose of safety symbols is to attract your at tention to possible dangers The safety symbols and the...

Page 5: ...ator s Safety Precautions 7 3 2 Operating Controls and Indicators 7 3 3 Assembly of Machine 8 3 4 Sanitizing 9 3 5 Freeze Down and Operation 9 3 6 Removing Mix From Machine 10 3 7 Disassembly of Machi...

Page 6: ......

Page 7: ...ols to provide a uniform product They operate with almost any type of frozen beverage mix This manual is designed to help qualified service personnel and opera tors with the installation operation and...

Page 8: ...6 cm Weight 55 lbs 24 9 kg 75 lbs 34 0 kg Electrical 1 Phase 115 VAC 60Hz 1 Phase 115 VAC 60Hz running amps 5 5A 12A connection type NEMA5 15P included NEMA5 15P included Compressor 426 Btu hr 608 Btu...

Page 9: ...on of the machine involves moving the machine close to its permanent location removing all crating set ting in place assembling parts and cleaning A Uncrate the machine B Remove the packing material a...

Page 10: ...our Button changes the hour when setting the time or programming a defrost setting Minute Button The Minute Button changes the minute when setting the time or programming a defrost setting Bypass Butt...

Page 11: ...Press the h and m button to set the time D Press the P button to save the setting E The display shows a 2 which signifies when the machine returns to normal operation Follow steps B C and D above to p...

Page 12: ...Operators Manual 513852 Rev 2 6 CBD Model Machines...

Page 13: ...ne until the main electrical power has been disconnected Unplug the machine at the plug Do not pull the electrical cord to disconnect the machine from the power source H Donotoperateunderunsafeoperati...

Page 14: ...ogrammed for defrost mode at specific intervals The timer is located behind the right panel To program the timer refer to Section 2 4 D Spigot Lock The Spigot Lock is a lever located behind the spigot...

Page 15: ...es Any sanitizer must be used only in accordance with the manufacturer s instructions In general sanitizing may be conducted as follows A Prepare Stera Sheen Green Label Sanitizer or equivalent accord...

Page 16: ...uency of cleaning the machine and ma chine parts must comply with local health regula tions After the mix has been removed from the machine follow the steps below to disassemble the parts A Remove the...

Page 17: ...on 3 9 ROUTINE CLEANING To remove spilled or dried mix from the machine exterior wash in the direction of the finish with warm soapy water and wipe dry Do not use highly abrasive materials as they mar...

Page 18: ...Operators Manual 513852 Rev 2 12 CBD Model Machines...

Page 19: ...tes Once the calibration is completed normal operation continues COLD DRINK MODE LED BLINKING This indicates that the defrost mode is active Refer to Section 2 4 for details on the defrost mode SLUSH...

Page 20: ...Operators Manual 513852 Rev 2 14 CBD Model Machines...

Page 21: ...TION 5 REPLACEMENT PARTS Part Description Quantity 324987 Decal Pull Here 1 per tank 5 1 DECALS Part Description Quantity 493128 Cover Tank 1 per tank 396697 Gasket Tank 1 per tank 724058 Tank 1 5 Gal...

Page 22: ...ontal Auger 1 per tank 428096 Handle Assembly 1 per tank 442128 Lever Tank Clamp 2 per tank 442129 Hook Tank Clamp 2 per tank 538620 Fastening Nut Vertical Auger 1 per tank 538621 Auger Service Knob 1...

Page 23: ...onent from into the equipment Those obligations remedies are subject to the conditions that Buyer a signs and returns to Stoelting upon installation the Start Up and Training Checklist for the affecte...

Reviews: