background image

State: 26.08.2021 p.  7

Mounting instructions for multiplay „gravis 4B“

Item-No.  51 5519 442

©  stilum GmbH, Gewerbegebiet Larsheck, D-56271 Kleinmaischeid  •  Tel. +49 (0) 2689 92790-0  •  All rights and product modifications reserved

13. Place the base plate of the climbing net onto the foundation and connect the 

climbing net (diagram 5a) with the tower at the intended locations acc. to 
diagram 1 and 6b. Please fasten the parts using the shackles included in the 
delivery.

14. Align the play equipment once more on the foundations, so that the wobble 

bridges do not sag too much. 

Note:

 The climbing net should be placed with tension to avoid droop.

15. Drill holes into all foundations and screw the play equipment to the founda-

tions with the included heavy-duty dowels.

16. Cover the entire impact area with fall protection according to the required 

drop height in accordance with EN 1176-1.   

Critical drop height: max. 2200 mm 

Recommended surface material: sand, wood chips, gravel, synth. impact 
protection. 

17. Do not allow children to use the equipment before the installation has been 

finished.

 

Attention:

 If the play equipment has been incompletely installed or partly dis-

mantled when carrying out maintenance and repair work, this may lead to
particular risks of injury for the user. For this reason, make clearly visible that the 
equipment shall not be used in such cases.
 

NOTE: 

Play equipment, which contain components made of stainless steel 

should not come with „normal“ steel parts in contact. Those steel parts may rub 

off and leave small steel particles in combination with moisture brown rust stains. 
If such corrosion occur on stainless steel parts, they are fine to remove with an 

abrasive (240 grit).

Please take care when transporting and setting up the fact that the components are 
made of stainless steel with no „normal“ steel parts in contact.

In order to preserve a good visual appearance of your stilum playground equipment 
over a long period one should take care of maintenance of the stainless
surface even despite of their corrosion resistance. Especially areas, which can not 
be reached by rainfall, should be frequently cleaned from dirt and deposits due to air 
pollution and dirt caused by the atmosphere. Light soiling can easily be removed by 
using a high pressure cleaner.  
For persistent deposits use a clean cloth moistened with a special liquid cleaner 

(e.g. on phosphoric acid) and rinse off with clear water after a short application time. 

During cleaning with mild abrasive components, only wipe over stainless steel sur-
face in polishing direction.  
For heavily soiled surfaces, polishes can be used (e.g. for cleaning chrome on cars) 
or for greasy and oily dirt alcoholic cleaning agents and solvents (e.g. ethyl alcohol, 
isopropyl alcohol or acetone). However, it should be noted that the dissolved soiling 
is not spread over the surface again.  
Do not use any chloride or hydrochloric containing cleaning products nor scouring 
powder, bleaching - or silver polish cleaner. Cleaning intervals depend on type and 
degree of soiling as well as on demands made on optical characteristics. Therefore 
cleaning is advisable at intervals of six to twelve months – whereby in
the case of strong soiling it is appropriate to clean the playground equipment at inter-
vals of three to six months.

Summary of Contents for Multiplay gravis 4B

Page 1: ...mbH Gewerbegebiet Larsheck D 56271 Kleinmaischeid Tel 49 0 2689 92790 0 All rights and product modifications reserved climbing eye platform climbing balls layaway bow slide wobble bridge climbing wall...

Page 2: ...After a setting period of 10 14 days depending on weather conditions and foundation size fill up and compress the holes between the foundation and the foundation hole with excavation Diagram 2 Top vi...

Page 3: ...040 2778 1958 1523 635 635 5273 2332 2905 1985 1513 17012 15531 6 0 740 740 1559 1559 7 7 1 5 5 0 3 1 2 6 4 4 6 9 7 1 3084 2164 3044 3032 2 6 4 4 5 8 3 4 7 9 9 6 7 6 1 4 7 0 0 3 7 1 1 5 6 7 9 4 3 0 5...

Page 4: ...ery 11 Connect the slide diagram 5g with the tower at the intended locations acc to diagram 6c Please fasten the parts using the screws including in the deli very 12 Connect the climbing balls diagram...

Page 5: ...193650 2 x BENENNUNG DATUM NAME WERKSTOFF Diagram 5g Attachment part slide Diagram 5h Attachment part parallel bars slide Diagram 5d Attachment part climbing balls Diagram 5a Attachment part climbing...

Page 6: ...t Larsheck D 56271 Kleinmaischeid Tel 49 0 2689 92790 0 All rights and product modifications reserved pipe adapter Diagram 6c Attachment for slide Diagram 6a Attachment for layaway bow climbing balls...

Page 7: ...in combination with moisture brown rust stains If such corrosion occur on stainless steel parts they are fine to remove with an abrasive 240 grit Please take care when transporting and setting up the...

Reviews: