Mounting instructions for multiplay „gravis 4B“

Item-No.  51 5519 442

©  stilum GmbH, Gewerbegebiet Larsheck, D-56271 Kleinmaischeid  •  Tel. +49 (0) 2689 92790-0  •  All rights and product modifications reserved

6.  Clean the foundation surface. Connect the platform to the posts acc. to 

diagram 1 and 4. Please fasten the parts using the screws including in the 
delivery. 

7.  Place the towers as shown in diagram 1 and 3a on the foundations and do 

a rough aligning. The connections of each wobble bridge and layaway bow 
should be face to face. 

Note: Do not screw the base plates onto the foundations yet!

     

8.  Place the climbing walls as shown in diagram 1,2 and 3a, 3b in the middle 

between two towers.  

Attention: Safe the climbing wall during the whole construction of the 

multiplay equipment against overturning.

9.  Connect the layaway bows with the towers and the climbing walls at the in-

tended locations acc. to the diagram 1, 5c and 6a and fasten the parts using 
the screws including in the delivery.

10. Mount the wobbel bridges with the towers and the climbing walls at the inten-

ded locations acc. to diagram 1, 5e and 6b. Please fasten the parts using the 
shackles including in the delivery.

11.  Connect the slide (diagram 5g) with the tower at the intended locations acc. 

to diagram 6c. Please fasten the parts using the screws including in the deli-
very.

12. Connect the climbing balls (diagram 5d), the sliding bow (diagram 5b) and 

the climbing eye (diagram 5f) and the parallel bars slide (diagram 5h) with the 
tower at the intended locations acc. to diagram 1 and 6a, using the screws in-
cluding in the delivery. 

Note: Take a look at the alignment of the elements 

acc. to diagram 1 and 2 to ensure the correct minimum space.

Diagram 4: Platform

connection post / tower

OHNE SCHRIFTLICHE ZUSTIMMUNG DER KAISER GMBH DARF DIESE 

TECHNISCHE UNTERLAGE WEDER VERVIELFÄLTIGT, NOCH DRITTEN MITGETEILT ODER 

ZUGÄNGLICH GEMACHT WERDEN, NOCH IN SONSTIGER WEISE MISSBRÄEUCHLICH VER- 

WENDET WERDEN. ZUWIDERHANDLUNGEN WERDEN URHEBERRECHTLICH VERFOLGT.

Oberflächen nach

DIN ISO 1302

Reihe 2

Zul. Abweichung

DIN 2768 - mH

1

 

gravis 1A

Benennung

Gepr.

Werkstoff

Blatt

Datum

Projekt

Gez.

Zuschnitt

Zeichnungsnummer

Rev

Änderung

Datum

1:50

A3

Gewicht

Name

Name

Turm Anbindung Rutschstange, 

Kugelaufstieg, Netz

1002-02-00

248.8

Maßstab

x

16.10.18

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Gewerbegebiet Larsheck

56271 Kleinmaischeid

Deutschland

OHNE SCHRIFTLICHE ZUSTIMMUNG DER KAISER GMBH DARF DIESE 

TECHNISCHE UNTERLAGE WEDER VERVIELFÄLTIGT, NOCH DRITTEN MITGETEILT ODER 

ZUGÄNGLICH GEMACHT WERDEN, NOCH IN SONSTIGER WEISE MISSBRÄEUCHLICH VER- 

WENDET WERDEN. ZUWIDERHANDLUNGEN WERDEN URHEBERRECHTLICH VERFOLGT.

Oberflächen nach

DIN ISO 1302

Reihe 2

Zul. Abweichung

DIN 2768 - mH

1

 

gravis 1A

Benennung

Gepr.

Werkstoff

Blatt

Datum

Projekt

Gez.

Zuschnitt

Zeichnungsnummer

Rev

Änderung

Datum

1:20

A3

Gewicht

Name

Name

Gestell

xxxx-xx-xx

81.0

Maßstab

Schramm

xx.xx.xx

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Gewerbegebiet Larsheck

56271 Kleinmaischeid

Deutschland

Summary of Contents for Multiplay gravis 4B

Page 1: ...mbH Gewerbegebiet Larsheck D 56271 Kleinmaischeid Tel 49 0 2689 92790 0 All rights and product modifications reserved climbing eye platform climbing balls layaway bow slide wobble bridge climbing wall...

Page 2: ...After a setting period of 10 14 days depending on weather conditions and foundation size fill up and compress the holes between the foundation and the foundation hole with excavation Diagram 2 Top vi...

Page 3: ...040 2778 1958 1523 635 635 5273 2332 2905 1985 1513 17012 15531 6 0 740 740 1559 1559 7 7 1 5 5 0 3 1 2 6 4 4 6 9 7 1 3084 2164 3044 3032 2 6 4 4 5 8 3 4 7 9 9 6 7 6 1 4 7 0 0 3 7 1 1 5 6 7 9 4 3 0 5...

Page 4: ...ery 11 Connect the slide diagram 5g with the tower at the intended locations acc to diagram 6c Please fasten the parts using the screws including in the deli very 12 Connect the climbing balls diagram...

Page 5: ...193650 2 x BENENNUNG DATUM NAME WERKSTOFF Diagram 5g Attachment part slide Diagram 5h Attachment part parallel bars slide Diagram 5d Attachment part climbing balls Diagram 5a Attachment part climbing...

Page 6: ...t Larsheck D 56271 Kleinmaischeid Tel 49 0 2689 92790 0 All rights and product modifications reserved pipe adapter Diagram 6c Attachment for slide Diagram 6a Attachment for layaway bow climbing balls...

Page 7: ...in combination with moisture brown rust stains If such corrosion occur on stainless steel parts they are fine to remove with an abrasive 240 grit Please take care when transporting and setting up the...

Reviews: