25 |
P a g e
STEP 4.0
COLLAR TIE INSTALLATION
4.0 - ASSEMBLY
–
COLLAR TIE INSTALLATION
PART CODE QTY
DESCRIPTION
CT
1
Collar tie
65HHS
4
65mm Hex head screw
4.0 - ASSEMBLY PARTS
–
COLLAR TIE INSTALLATION
Holding Collar tie tight and level in position screw through CT into Roof Rafter. Screw
through center on angle up into ridge beam.
If Double door option was chosen go to step 4.5