![STILLA Master Assembly Instructions Manual Download Page 17](http://html.mh-extra.com/html/stilla/master/master_assembly-instructions-manual_1380040017.webp)
16 |
P a g e
STEP 3.1
FRONT GABLE ASSEMBLY
3.1 - ASSEMBLY PARTS
–
GABLE ASSEMBLY
PART CODE QTY
DESCRIPTION
1
Assembled front gable
1
Assembled back gable
65HHS
7
65mm Hex head screw
3.1 - ASSEMBLY
–
GABLE ASSEMBLY
Carefully position front gable in position ensuring tongue on wall goes into groove on gable.
Fasten up through front panels using 2 x 65HHS either side. Repeat with back gable using 1
x 65HHS either side and centre. Ensure gables are flush with end of front and back panels.