15 |
P a g e
STEP 3.0
BACK GABLE ASSEMBLY
3.0 - ASSEMBLY PARTS
–
GABLE ASSEMBLY
PART CODE QTY
DESCRIPTION
G
4
Gable
65HHS
9
65mm Hex head screw
FGS
1
Front gable cover strip
SCS
1
Stilla branded cover strip
40N
10
40mm Nail
DH
1
Door Head
3.0
- ASSEMBLY
–
GABLE ASSEMBLY
Lay 2 x G (left and right) on a flat surface with the frame facing upwards
–
see picture below.
Screw together in position shown, holding flush at the bottom (using 2 x 65HHS). Repeat for
other gable.
Turn one complete gable over (cedar facing upwards). Position (SCS) Stilla branded cover
strip flush with bottom of gable Board and flush on each end. Nail through cover strip into
gable using 40N.
Position (FGS) front gable cover strip over join in front gable. Fasten in position using 40N.
Hold DH (Door Head) centre along base plate of gable. Screw down through gable base plate
into DH centre and ends using 3x65HHS.