4
Operation
General commissioning
General commissioning
Commissioning
If the vehicle is delivered only partially assem-
bled, ensure before commissioning that the
whole truck has been professionally assem-
bled. All hydraulic and electrical connections
have to be checked. The connections, which
must be disassembled for shipping should be
reassembled carefully. All nuts and bolts must
be tightened to the appropriate torque. After
the oil levels on the hydraulic tank and gear
box have been checked, commissioning can
begin. This commissioning should be done
professionally be our service personnel. Be-
fore starting work, work through the Checklist
before starting work.
Weights of the units
Industrial trucks are mainly transported in a
disassembled state and must be assembled
on site. You must ascertain the weight of
the individual units in order to assemble the
truck safely and to select a suitable harness.
Our industrial trucks are constructed using
a modular system. Our trucks also have
numerous customer-specific characteristics.
For this reason, it is difficult to specify the
correct weight for each unit and for each
variant. The information and table for the
lift masts below provide rough guidelines.
For safety reasons, always add a generous
margin when rounding up the determined
value.
40
5231 804 2502 EN - 11/2017
Summary of Contents for MX-X
Page 1: ...Original instructions Order picking truck MX X 2332 2334 5231 804 2502 EN 11 2017 ...
Page 2: ......
Page 7: ...1 Foreword ...
Page 15: ...2 Safety ...
Page 26: ...2 Safety Personal protective equipment 20 5231 804 2502 EN 11 2017 ...
Page 27: ...3 Overview ...
Page 45: ...4 Operation ...
Page 90: ...4 Operation Parking decommissioning 84 5231 804 2502 EN 11 2017 ...
Page 91: ...5 Regular care and maintenance ...
Page 103: ...6 Technical data ...
Page 105: ...7 Special equipment ...
Page 131: ......