EN
GL
ISH
www.stiebel-eltron.com
SBP 100|
33
INSTALLATION
Installation
Version II: Installing the WPKI-H E and WPKI-V
20
0
40
60
80
100
120
°C
1.
2.
D
00000
35
88
8
6
5
4
3
1
2
1 "Charging station flow opt." connection
2 "Cylinder return" connection
3 "Charging station return opt." connection
4 Connection for expansion vessel, drain valve
5 "Heating return" connection
6 "Heating flow" connection
WPKI-H E
f
f
Install "heating flow" and "heating return".
f
f
Install the EPS insulation parts.
WPKI-V
f
f
Connect the expansion vessel and the drain valve.
f
f
Install the "charging station flow opt.", "charging station re-
turn opt." and "cylinder return".
f
f
Install the EPS insulation parts.
Wall mounting bracket
415
D
00000
48
10
4
f
f
If necessary, trim the wall mounting bracket threaded pin as
appropriate for the distance between the cylinder and the
wall.