Commissioning
LA 60 Trend | LA 60 Plus
| 31
ENGL
IS
H
Timed
L
N
G1
2
1
S L
N
N
M
C
X1
100 %
0 %
S1
d
00000
83
79
9
X1 Terminal module, fan
G1 LA 60 Ve-U & ZLA 60-T60 /
LA 60 Ve-A & ZLA 60-T60
s1 switch
Humidity-controlled with base load
L
N
G1
2
1
S L
N
N
M
C
X1
100 %
50 %
S1
X1
Klemmbaustein Lüfter
G1
LA 60 Plus
S1 Schalter
d
00000
83
79
8
X1 Terminal module, fan
G1 LA 60 Ve-U & ZLA 60-H /
LA 60 Ve-A & ZLA 60-H /
s1 switch
Timed with base load
L
N
G1
2
1
S L
N
N
M
C
X1
100 %
50 %
S1
d
00000
83
80
2
X1 Terminal module, fan
G1 LA 60 Ve-U & ZLA 60-T /
LA 60 Ve-A & ZLA 60-T
s1 switch
11. Commissioning
For windowless bathrooms and toilets where little moisture
occurs in normal use, the extract air flow rate, according to
dIN 18017-3, can be reduced to 0 at times when air demand is
low. In this case, the appliance must have a run-on time capa-
ble of extracting at least 15 m³ of air from the room.
11.1 Checks before commissioning
!
Material losses
Never operate the appliance without filters.
f
Check whether the filter is installed.
11.2 Initial start-up
!
Material losses
If there are excessively large amounts of dust outside
or inside, the filter and ventilation components may
become clogged. dust is created by cutting tiles or
working with plasterboard, for example.
f
do not operate the appliance during building
work.
Appliance handover
f
explain the functions of the appliance to the user. show
the user how to operate the appliance.
f
Make users aware of potential dangers.
f
Make users aware of critical environmental factors and
requirements concerning the installation site.