28
04/24999499
Possible connections
• pressurized gas generator 24 V DC (max. 8 pieces connected in series; each 1.0 - 1.6 Ohm per piece)
• 10 SHE manual call points RBH/3A... (line termination via enclosed end resistance), 1 SHE manual call point is
integrated
• 10 automatic detectors with 2-wire-technology, optical smoke detectors and/or detectors of heat differential and/or
detectors of maximum heat
• potential free transmission of the signals Alarm (SHE activated) and/or malfunction collection (max. 24 V / max. 0.5 A)
• 24 V DC siren or
fl
ashing lights, max. 100 mA
Assembly
The SHE control panel has to be installed in a dry room. The assembly places for the
SHE manual call points and the vent switches must be well visible and accessible
(SHE call point = 1.4 m over the top edge of the
fl
oor). Do not assemble behind wall
projections, door casements or hide behind construction elements.
Open the SHE control panel and
fi
x it at the speci
fi
ed 4 bore-holes to the construction body.
Make sure to provide appropriate material for the
fi
xations. Assembly of control elements,
drives, junction boxes, pressurized gas generators and automatic detectors according
to their joint operating instructions. Please observe applicable regulations (see page 26-27).
Example of assembly
Smoke vent, domelight 170° with thermic electrical control (pressurized gas generator).
Note
: This is a construction recommendation. Please observe the particular regulations.
Several SHE manual call points and smoke detectors could be required.
TRZ Plus DG
Pipeline: steel 6 x 0.7 mm from releasing device to pneumatic lift cylinder
Releasing device: pressurized gas generator with CO
2
bottle
SMOKE VENT
SHE control panel TRZ Plus DG
1,4 m
SMOKE VENT