Preparation
Specifications regarding the individual screen dimensions, weight, and
controls are provided by the factory when the unit is ordered. Before
beginning the installation:
Check the specifications for the type of switch control to be used.
Ensure that the mounting area and electrical connection are
prepared.
Check the size and weight of the screen to be installed so that
you can plan for the number of people required for the mounting
procedure. You need at least three people to mount the smaller
screens; more are needed for larger, heavier screens.
You will need:
Enough ladders for the personnel supporting the screen during
the mounting process
A level
Fasteners appropriate for the surface on which the screen is
being mounted
A 5/32” (4 mm) hex ball driver or Allen key
Unpacking
If there is a piece of paper protruding from the screenroll, do not remove it.
This paper will fall out as the screen is first deployed. (Some screens will not
require this paper.) You will remove the screen lock-down brackets after you
make the electrical connection; when the door is first opened it is stopped
and the screen deploys. Refer to the information in "Operating the System."
4
Stewart Filmscreen Corporation
P
REPARING THE
I
NSTALLATION
Before proceeding with the installation of this screen,
take time to thoroughly read and understand these
installation and operation instructions.
All electrical wiring installations must conform to local
and national codes and should be performed by
qualified service personnel.
There are no user-serviceable parts contained within
the unit.
Caution
During installation, do not place the unit on an unstable
cart, stand, table, or ladder. The unit may fall, causing injury
to a child or adult and damage to the unit.