PREPARING THE INSTALLATION
5
Be sure to unpack carefully in a clean area. Use special care when handling the screen so that it does not become soiled or damaged.
If you plan to repack your screen and hardware for transportation to another location, you may wish to photograph or make a
note of how it was packed. Keep the packing material.
Unpacking
Preparation
Note:
Bolts and other fasteners for the screen are standard gauge and sizes used in the U.S., regardless of where they
will be installed. For this reason, the sizes are expressed in inches rather than metric measurements.
Caution:
Do not stand on the screen tube or store it on its end. This will cause screen damage. If you are not going to install the
screen immediately, make sure it remains horizontal during storage.
♦
Lint-free, clean cloth gloves for handling the screen
♦
Ladders for the personnel supporting the screen during the mounting process
♦
A
level
♦
Fasteners appropriate for the surface on which the screen is being mounted
♦
A
drill
♦
Tools for tightening fasteners
You will need:
♦
Make sure there is a clean surface on which to unroll the screen and assemble the frame.
♦
Check the size and weight of the screen to be installed so that you can plan for the number of people required for installation.
You need at least two people to mount the smaller screens; more are needed for larger, heavier screens.
Before beginning the installation:
Specifications regarding the individual screen dimensions, weight, etc. are provided by the factory when the unit is
ordered.
Before proceeding with the installation of this screen, take time to thoroughly read and understand these
installation instructions.
Summary of Contents for Luxus Deluxe ScreenWall
Page 18: ...MAINTENANCE NOTES 18 ...
Page 19: ...19 ...