background image

The aperture mount allows you to install the screen into an opening in a
wall or wall unit.

A

PERTURE

M

OUNT

1. Prepare the aperture.

2. Assemble the frame.

as shown in the
section starting on
page 4.

5. Carefully insert the

frame (with the screen
already attached) into
the aperture. Take
care so that you do
not damage the
screen.

Figure 

8

:

Front view:  frame, mounting brackets, and screen

3. Attach optional

aperture mounting
brackets, if used.
Refer to Figure 

8

.

6. Attach the mounting

brackets to the wall
with the appropriate

fastener. Refer to
Figure 

9

.

©

2015

 Stewart Filmscreen Corporation

Figure 

9

:

 

Rear view:  

 

 frame, mounting brackets, and screen

4. Attach

 

the

 

screen.

 

G

to

 

the

 

section on

 

a

ttaching

 

the 

screen

 

t

o

 

t

he

 

fram

e

 

on 

page

s

 8

 & 

9

,

 

then

 

r

eturn

 

to this section

.

1

2

Summary of Contents for Cima

Page 1: ...PDF provided by Conference Room AV Stewart Filmscreen 00900 1092H Cima 92 Fixed Frame Projection Screen White 16 9 HDTV ...

Page 2: ... S TA L L E R B E S U R E T O L E AV E T H I S M A N U A L W I T H T H E O W N E R To the Owner Installation Instructions Screen Care Maintenance Fixed Frame Screen Owner s Manual Installation Instructions CFS 0415 ...

Page 3: ...tandard commercial and residential projection screens Please take a moment to review this manual as it will help ensure you many years of trouble free service from your new Cima by Stewart Filmscreen product This manual includes and describes procedures for several types of frames and mounts You must refer to the appropriate section for the type of Cima Fixed Frame you are installing In addition t...

Page 4: ...his document is updated Current versions of documentation are posted on the Stewart Filmscreen website at Contents Assembling the Frame 5 Mounting the Frame 6 Attaching the Screen To Frame 9 Adjusting the Screen Fabric 10 Attaching the back support to the frame where required 11 Screen Care and Cleaning 13 Mounting the Frame Section View 7 General Notes for Preparing the Installation 4 Product War...

Page 5: ...structions Drill for making holes to attach brackets to the mounting surface as needed Check the size and weight of the screen to be installed so that you can plan for the number of people required for the mounting procedure You need at least two people to mount the smaller screens more are needed for larger heavier screens Make sure there is a clean surface on which to unroll the screen and assem...

Page 6: ... 2015 Stewart Filmscreen Corporation Cima Fixed Frame Screen Owner s Manual ...

Page 7: ... you will mount the wall bracket and temporarily attach the frame prior to attaching the screen fabric Holes for supporting the bracket are not pre drilled you can drill holes so that the frame mounting is attached to wall studs On the bottom of the frame there are magnets you canslide to align with wall studs fasten the steel disks to the wall where studs are located If the wall is not perfectly ...

Page 8: ...MOUNTING THE FRAME SECTION VIEW Figure 3 Components for wall mount Figure 4 Hang the frame on wall mount 2015 Stewart Filmscreen Corporation 7 Cima Fixed Frame Screen Owner s Manual ...

Page 9: ...nails Do not use any tools to fasten the screen to the frame Do not fold or crease the screen 1 Remove the screen from the cardboard shipping tube 2 On a clean floor unroll screen viewing side up This section provides the general instructions for attaching the screen to the frame DO NOT perform this step UNTIL instructed to do so in the section for the specific type of mount you are using GENERAL ...

Page 10: ... screen into the frame Gently allow the screen to stretchonto the snaps Do not jerk the material as it can rip Refer to Figure11 Attach the snaps on the top corners and top horizontal first Figure 12 Attaching all top snaps first 3 Lift the frame to a vertical position to finish attaching the sides and bottom rows of the snaps Refer to Figure 12 2015 Stewart Filmscreen Corporation 9 Cima Fixed Fra...

Page 11: ...reen mounted on wall 1 If there are puckers in the screen you can use a screwdriver to tap the snaps so that the puckers are removed A movement of 1 16 to 1 8 1 6 mm to 3 2 mm is usually sufficient to eliminate puckers Refer to Figure 5 2015 Stewart Filmscreen Corporation 10 Follow the procedures below to adjust the screen should there be any wrinkles or puckers ...

Page 12: ... 2015 Stewart Filmscreen Corporation Cima Fixed Frame Screen Owner s Manual 11 ...

Page 13: ...e Take care so that you do not damage the screen Figure 8 Front view frame mounting brackets and screen 3 Attach optional aperture mounting brackets if used Refer to Figure 8 6 Attach the mounting brackets to the wall with the appropriate fastener Refer to Figure 9 2015 Stewart Filmscreen Corporation Figure 9 Rear view frame mounting brackets and screen 4 Attach the screen Go to the section on att...

Page 14: ...absorb excess water Residual water marks will evaporate within a few minutes VeLuxTM covering Use a lint roller to remove particles from the VeLux material Replacement parts and service No user serviceable parts are contained within the unit Contact your dealer or the factory if you require part replacement or service SCREEN CARE AND CLEANING Caution Do not use any other cleaning materials on the ...

Page 15: ...tergent solution with clean rag or cotton swab With reasonable care you may expect many years of trouble free use from your Cima projection screen 2015 Stewart Filmscreen Corporation Refer to the following guidelines if you encounter a difficulty in the operation of your Cima Fixed Frame Should you have a problem that is not addressed here call Stewart Filmscreen 14 ...

Page 16: ...to Stewart transportation freight expenses to and from Stewart are payable by the purchaser Stewart is not responsible for damage in shipment To protect yourself against damage or loss in transit insure the product and prepay all transportation expenses mandated by statute or rule of law are limited to the one 1 year warranty period This warranty gives will Stewart be liable for sums in excess of ...

Page 17: ...1 800 762 4999 Fax 310 326 6870 15336 www stewartfilmscreen com ...

Reviews: