AT 3.0
5
PREPARING THE INSTALLATION
Before proceeding with the installation of this screen, take time to thoroughly read and understand
these installation and operation instructions
Specifications regarding the individual screen dimensions, weight, and mounting are provided by the
factory when the unit is ordered Before beginning the installation:
`
`
Check the specifications
`
`
Clear an area at least equal to the frame dimensions Lay out clean paper or plastic as a clean work
surface (Screen or mask fabric will attract dust or dirt if the area is not clean )
`
`
Check the size and weight of the screen to be installed so that you can plan for the number of people
required to move it You need at least four people; more may be needed for larger, heavier screens
For larger screens, you will need special equipment to support the screen tube and to elevate personnel
to an appropriate height for attaching the screen to the frame
You will need:
`
`
For screens whose top is high off the ground, use a rolling scaffold, scissors-lift, or genie lift
`
`
For larger screens, use a crane or block-and-tackle to hoist screen tube into place and support it
during installation
`
`
For smaller screens, use a 4-wheel equipment dolly to support the screen tube
`
`
Other items include:
`
Level + Measuring tape
`
Tools to fasten bolts
`
Cutters to cut tie-off cords
Be sure to read instructions completely before beginning The general sequence for installation is:
`
`
Assemble frame
`
`
Assemble support (wall mount, stage-fly mount, or T-stand)
`
`
Attach screen
i
CAUTION
During installation, do not place the components on an unstable cart, stand, table, or ladder The
item may fall, causing injury to a person and damage to the component