AT 3.0
11
INSTALLATION: AT FRAME (CONTINUED)
3 Slowly raise the top of the tube to lift the screen into position while moving the bottom of the screen
along the floor until the screen is in the vertical position at the audience left side of the frame
4 If used, adjust the optional extension post at the bottom of the screen so that the screen is at the
correct height
5 Cut the first tie cord and unroll the screen so that the grommets on the left side of the screen are
exposed (Do not cut all tie cords at this time )
`
`
Unroll the screen slowly making sure to cut each successive tie cord so that the screen is free to
unroll
`
`
Do not the cut all the tie cords at once, as they support the screen until it is attached to the frame
`
`
You can cut one or two tie cords ahead of the attachment as the screen is unrolled so that there
is no danger of pulling out a grommet when the screen is unrolled
Tie cords
Bottom of screen
Extension post
Throughbolt
Figure 12: Screen top with cable from crane
Figure 11: Optional extension post
Optional extension post
Figure 13: Beginning to attach screen to frame
Lift