9
FAUCET INSTALLATION
Important:
The Tubular base
should be installed so that the
outside surface of the finished
wall falls between the minimum
and maximum lines marked at
protective plastic cover.
5. Assemble the rigid pipes from
the nipple at the box to the inlets
at the Tubular base.
6. Insert the cables sleeve inside
the Tubular box through the hole
at the top of the Tubular box. If
the cables sleeve is too long at
the specific location, you can
shorten it as needed. Make sure
you will not damage the cables
inside the sleeve while you cut it.
7. Assemble the temporary panel to the Tubular box.
8. Once the works on electricity, plumbing and tiles
have been finished, cut the temporary protective
cover at the proper mark at the wall level.
See Fig. 3.
9. Insert the wall rosette through the Tubular base
and pass the cables from the spout through the
rosette.
10. Connect the cables from the spout to the cables
coming from the cables sleeve.
11. Fix the rosette to the Tubular base with the 2
provided screws.
12. Connect the electronic unit’s connector coming
from the cables sleeve to the power splitter solenoid’s
connector.
13. Connect the cables from the power splitter leading
to the solenoids to the solenoid’s connectors.