7. Trans port, As sem bly and Sto ra ge
»
This chap ter is in ten ded for all ope ra ting per son nel of the equip ment.
Per son nel using the se in struc tions must be in struc ted in the re gu la tions for
the pre ven ti on of ac ci dents, the ope ra ting con di tions and sa fe ty re gu la tions
and their im ple men ta ti on.
En su re in each case that the ope ra ting per son nel are suf fi cient ly in form ed.
Plea se in form all per sons wit hin the ran ge of ac ti on of the equip ment of the
di rect and in di rect ha zards con nec ted with the equip ment.
Plea se ob ser ve all sa fe ty re gu la tions for the ope ra ti on of lif ting equip ment.
0
2
6-
2
M
S
De hu mi di fied Air Dry er
Trans port, As sem bly and Sto ra ge 7-1
Summary of Contents for Sterling Dehumidifier STT 500
Page 71: ...0 2 6 2 M S STT 500 Technical Data 9 2 All dimensions are in mm in Subject to alteration...
Page 72: ...Dimension sheet 0 2 6 2 M S STT 500 Technical Data 9 3...
Page 80: ...Accessories Entering values on the OP 7 17 Sterling Material Processing B G 1 0 2 0...
Page 86: ...Accessories Flap control with Fuzzy Logic Sterling Material Processing B G 0 0 0 1...