5.6. Chan ging the bat te ry of the con trol sys tem
»
This work may be car ried through only by qua li fied per son nel trai ned in the
field of elec tri cal en gi nee ring.
F
The bat te ry may be chan ged only with the con trol sys tem swit ched on.
Open the con trol box by me ans of the con trol box key which is part of the supp ly.
Open the front door of the CPU.
Pull the ba ckup bat te ry with ca ble out of the com part ment.
Plug the con nec tor of the new ba ckup bat te ry into the
cor re spon ding so cket in the bat te ry com part ment of
the CPU.
&
The notch on the
bat te ry con nec tor must point to the left!
Pla ce the ba ckup bat te ry into the bat te ry com part ment on the CPU
.
Clo se the front door of the CPU
Clo se the con trol box.
0
2
6-
2
M
S
STT 500
Main ten an ce 5-11
Summary of Contents for Sterling Dehumidifier STT 500
Page 71: ...0 2 6 2 M S STT 500 Technical Data 9 2 All dimensions are in mm in Subject to alteration...
Page 72: ...Dimension sheet 0 2 6 2 M S STT 500 Technical Data 9 3...
Page 80: ...Accessories Entering values on the OP 7 17 Sterling Material Processing B G 1 0 2 0...
Page 86: ...Accessories Flap control with Fuzzy Logic Sterling Material Processing B G 0 0 0 1...