Customer
____________________________________
Job Name & Number
_________________________
PRE-INSPECTION INFORMATION
With power and gas off.
Type of Equip:
Unit Heater
Serial Number _________________________ Model Number __________________________
Name Plate Voltage:
_____________
Name Plate Amperage: _____________
Type of Gas:
Natural
LP
Tank Capacity _______ lbs.
Rating: _ _____ BTU @ ____ °F
_______ kg
_ _____ kw @ ____ °C
❐
Are all panels, doors, vent caps in place?
❐
Has the unit suffered any external damage?
Damage ______________________________
❐
Does the gas piping and electric wiring appear to be installed in a professional manner?
❐
Has the gas and electric been inspected by the local authority having jurisdiction?
❐
Is the gas supply properly sized for the equipment?
❐
Were the installation instructions followed when the equipment was installed?
❐
Have all fi eld installed controls been installed?
❐
Do you understand all the controls on this equipment?
If not, contact your wholesaler or rep.
(DO NOT START this equipment unless you fully understand the controls.)
GAS EQUIPMENT
START-UP
GENERAL
With power and gas off.
❐
Make certain all packing has been removed.
❐
Tighten all electrical terminals and connections.
❐
Check all fans & blowers for free movement.
❐
Check all controls for proper settings.
BLOWER
With power on and gas off.
❐
Check voltage L1 _____ L2 _____ L3 _____
❐
Check rotation of main fan.
❐
Check motor amps L1 _____ L2 _____ L3 _____
Remarks:
_____________________________________________
__________________________________________________
__________________________________________________
GAS HEATING
With power and gas on.
❐
Inlet gas pressure.
____ in. W.C. or ____ kPa
❐
Pilot & main burner ignition.
❐
Manifold gas pressure. ____ in. W.C. or ____ kPa
❐
Check electronic modulation. Set at: __________
❐
Cycle and check all other controls not listed.
❐
Entering air temp. _____ °F or ____ °C
❐
Discharge air temp. (high fi re) ____ °F. or ____ °C
❐
Cycle by thermostat or operating control.
27
Summary of Contents for QVEF 100 M
Page 12: ...12 Figure 10A VENTING continued Figure 10B...
Page 13: ...13 Figure 10C VENTING continued Figure 10D...
Page 26: ...NOTES 26...
Page 28: ......