12
12
4. Remove the valve cap from the valve stem and attach the nozzle to the tire’s
valve stem.
5. Move the nozzle lever down to secure the nozzle to the valve stem.
6. Turn compressor switch on to “|” position.
7. Monitor the pressure gauge while inflating the tire. When recommended tire
pressure has been reached, turn the compressor off to “O” position.
8. Disconnect hose and replace valve cap.
9. Surround the hose around the power station body and recharge the power
station as soon as convenient.
Summary of Contents for JMP-100
Page 1: ......
Page 18: ......
Page 23: ...6 6 13 Pressure indicator 14 Air compressor switch 15 Air hose...
Page 35: ......