USA and Canada 800.683.2378, International 904.641.1666
35
CENTER THE TUBE
1.
Ensure the pump is off. Lift the latch located between the tube fittings, leaving the end
of the latch engaged with the lip on the tube housing cover. Leave the latch on the
opposite side engaged.
Illustration O p31
2.
Plug the pump in and turn it on. Turn the tube fitting on the suction side not more
than 1/8 of a turn in the direction the tube must move.
Illustration P p31
3.
DO NOT let go of the fitting until the tube rides approximately in center of the rollers.
4.
Turn the pump off, let go of the fitting, and secure the latch between the fittings.
For CE pump only: Reinstall the safety screw on the cover.
5.
Inspect the suction and discharge lines, point of injection, and check valve duckbill for
blockages. Clean and/or replace as required.
6.
Reconnect the suction and discharge lines.
7.
Turn the pump on and verify operation.
TUBE REPLACEMENT – SINGLE HEAD
Adjustable & Fixed Output Pumps