Stellar
®
120-16-20 Shuttle Owner’s Manual | Page 21
Step 12: Install Hoist Up Alarm - PN 83115
Install the hoist up alarm onto the base of the hooklift as shown:
A
DETAIL A
SCALE 1 : 8
NOTE: MOUNT SWITCH ON BRACKET LOCATED ON THE BASE
NOTE: BRACKET SHOWN AS REFERENCE ONLY
2
3
1
3
4
USE 29409 TO GROUND BLACK WIRE
USE C0073 TO CONNECT RED WIRE
TO THE CONTROLLER ASSEMBLY
PEDESTALS (BLUE) DUMP UP LIGHT WIRE
ITEM
PART
DESCRIPTION
QTY.
1
45907
SWITCH REMOTE KP60
1
2
30472
CAP SCR #10-24X1.25 BTNHD SS
3
3
D0178
WASHER #10 SAE FLAT
6
4
26034
NUT #10-24 HH NYLOC
3
ITEMS NOT SHOWN:
C0073 - TERML 16-14 BUTT WATER TIGHT X 5
3878 - WIRE 18GA (RM) RED (PRIMARY) SAE J-1128 X 15FT
15211 - WIRE 18GA (RM) BLUE SAE J-1128 X 15FT
15208 - WIRE 18GA (RM) GREEN SAE J-1128 X 15FT
61233 - LIGHT LED CONTROL PANEL RED X 1
88324 - ELEC SCHEM CONTROL TOWER X 1
NOTE:
INSTALL DUMP UP LIGHT (PN 61233) IN CONTROL TOWER IF AIR CONTROLS AND IN
DASH ON STREET SIDE OF STEERING WHEEL IF CABLE OR ELECTRIC CONTROLS.