Page 26 | Stellar
®
108-14-40 Shuttle Owner’s Manual
Step 15: Operate hooklift.
•
Stellar
®
Hooklift operators must conform to the qualifications specified
in the Shuttle Hooklift Safety, Operation, Maintenance, Troubleshooting Manual. Read
and understand all manuals and safety signs before operating or servicing this equip-
ment.
• Bleed the air out of the hydraulic system.
• Check the hydraulic oil level and add oil if needed. When checking hydraulic oil level,
make certain that all system cylinders are fully retracted.
• Calibrate dump light system.
• Be sure to check all clearances.
• Be sure that relief pressure is no higher than 4200 PSI.
Step 14: Fill reservoir and activate hydraulic flow.
• Fill reservoir to site gauge, within 3” from the top (Roughly 10 Gallons). Note: ISO 32 hy-
draulic oil is recommended.
• When connections are secure, activate hydraulic flow by opening the ball valve on the
bottom of the reservoir. This will allow oil to flow from the reservoir to the pump.
WARNING
Summary of Contents for 108-14-40
Page 8: ...Page 2 Stellar 108 14 40 Shuttle Owner s Manual Acceptable Subframe Dimensions Model 108 14 40...
Page 34: ...Page 28 Stellar 108 14 40 Shuttle Owner s Manual This page intentionally left blank...
Page 42: ...Page 36 Stellar 108 14 40 Shuttle Owner s Manual Optional Tab Alarm Wire Harness PN 26291...
Page 44: ...Subject to Change without Notification 2021 Stellar Industries Inc...