Page 14 | Stellar
®
108-14-40 Shuttle Owner’s Manual
1. Route hose line from the reservoir to the pump (See hose kit drawing for details).
2. Route hose line from the pump to the valve bank (See hose kit drawing for details).
3. Route hose line from the valve bank to the reservoir (See hose kit drawing for details).
4. Route hose line from the valve bank and the hooklift (See hose kit drawing for details).
Note: If using the Power Beyond feature for additional function, see “Power Beyond VDM8
Valve” later in this chapter for further details.
Notes on hose line routing:
• Protect these lines with hose wrap when necessary.
• Keep these lines away from sharp edges.
• Keep these lines away from the exhaust or other temperature extreme items.
• Keep these lines away from the driveshaft or other moving items.
Step 8: Route hydraulic hoses.
Face Seal (A)
Stellar
®
PN
Hose
Size
Fitting
Size
Stellar
®
PN
O-ring Boss (B)
#4
C2027
D1245
#6
C2028
D1246
#8
C2029
D1247
#10
32223
D1248
#12
D1244
D1249
#16
1”
3/4”
5/8”
1/2”
3/8”
1/4”
D1250
B
A
Face Seal/O-Ring Size Chart
Summary of Contents for 108-14-40
Page 8: ...Page 2 Stellar 108 14 40 Shuttle Owner s Manual Acceptable Subframe Dimensions Model 108 14 40...
Page 34: ...Page 28 Stellar 108 14 40 Shuttle Owner s Manual This page intentionally left blank...
Page 42: ...Page 36 Stellar 108 14 40 Shuttle Owner s Manual Optional Tab Alarm Wire Harness PN 26291...
Page 44: ...Subject to Change without Notification 2021 Stellar Industries Inc...