MOUNTING OF THE SUPPORT
The modules must be assembled in pairs and must be connected to a support. The carrier must be
screwed to the end part (4) with the 5 mm x 15 mm screws and the 6 mm nuts (10), fig. 8.
Note that the support must be attached to the lower profile part (4), Fig. 9. so that
the bolt heads are on the upper side of the profile and the nuts are on the lower side of the profile.
Fig. 8.
ASSEMBLY OF WORKING STRAIGHTS
After all modules have been installed and connected to the support, you can set them up at their
destination.
If your pool has an odd number of beams (e.g. a 730x366 pool with 3 beams), look for the centre of
the previously levelled area and place the first module there. Then attach the others of the same
length.
The same number of modules must be located on each side of the pool, Fig. 10 and Fig. 11.
It is extremely important that all profiles are straight, flat and perfectly aligned. Take your time to
make sure that this is the case.
MOUNTING THE METAL GUIDES
Then insert the transition guide "B" corresponding to the pool model you have purchased on both
sides of the first module (take into account that the oval model 550x366 is NOT equipped with
transition guides "B") (see transition guide table for this). The transition guide must be located in
the runner connection (6), fig. 12.
On each side of the pool, place the transition guide in the track connection (6), Fig. 13 Then
continue with the installation of the transition guides "A".
Fig. 9.