7.
Display Shelf Option: Insert two (2) flanged screws per shelf into
pre-drilled holes in back panel. Hook display shelves over rear
flanged screws and snap side flanges over pre-installed spring
buttons.
8.
Task Light Option: Refer to Assembly Directions included with the
task light. Route power cord through hole in back panel provided.
Note: If finished back panel is already installed, remove it before this
step to allow ease of access to power cords.
8
9
Flanged screws
Spring buttons
Recommended location of task light
3
"
9
"
Back Panel hole
Power cord entry hole for light
®
HEALTH
Page 9 of 13
Doc # 135357
939599300 Rev C