Page 7 of 20
005720D Rev F
®
Install the wire management
cableway on the underside of
the worksurface about 5" in
front of the control box.
Connect the cables of each lift column. Route these
cables in the wire management cableway. Refer to
the wiring guide for more information.
15
14
5"
WIRE MANAGER
Note: stretchers and cables not shown for clarity.