
I N S T A L L A T I O N
Verical duct
Ai
r
Ai
r
steamOres
humidifier
Steam ramp
(supplied)
Slope
2°minimum
Figure 11 – vertical rectangular duct
Installation steps :
1. Position & mount the steam ramp to the ventilation duct wall by using metal screw
2. Install steam hose in between steam ramp and RES steam humidifier.
Note: when using rigid steam pipe (stainless steel or copper) it is a good practice to install a small
piece of steam hose to interconnect between steam ramp, rigid pipe and RES steam humidifier.
Important
: ensure a minimum downward slope of 2°
3. Secure all connections with hose clamps
Caution
:
Risk of burnt or flooding or malfunction.
Any obstruction in the steam hose can result in injuries and/or damage.
Ensure that there is no
kink
or
sag
in the steam hose and that this one if well maintained and attach
Hose kinked
will cause obstruction
Sag in the hose
will block the hose with condensate
Figure 12 – Wrong steam hose installation
16
Summary of Contents for RES Series
Page 28: ......