Models:

 SM-12 and SM-15

IMPORTANT: 

the warranty of this product is voided if it is used in a commercial application or for anything other than a 

residential steambath installation.

Steambath Generators

WARNING: 

Elderly persons, pregnant women, or those suffering from heart disease, high blood 

pressure,  diabetes,  or  who  are  otherwise  not  in  good  health,  do  not  use  this  device  unless 

directed to do so by a physician. Also, do not use steambath while under the influence of alcohol.

!

07/07

Pub. No. 324-G

C

US

®

LISTED 995C

Plumbing Installation Instructions

The Steamist “SM” Generator comes factory assembled, 

carefully wired and tested.
The  Plumbing  Installation  must  conform  to  local  and 

national codes. All electrical power should be turned OFF 

when working with Steam Generator.

Be sure that the proper size Steam Generator has 

been selected by using the sizing page in the

 “Full 

Line  Brochure,”  “Pricing  Guide,”  “The  Generator 

Sizing  Guide,”    Architectural  Guidelines,”  or 

in  the 

Residential 

Systems/Steambath 

Product 

Information  section  of  the  Steamist  web  site  - 

www.steamist.com.

CAUTION: 

An  improperly  sized  Steam  Generator 

may 

NOT

 produce the amount of steam necessary 

to reach selected temperature.

IMPORTANT: 

Refer to page 4 for model required for 

cubic foot rating.
The Steam Generator should be located as close as 

possible  to  the  Steam  Room/Shower  or  tub 

enclosure.  Steam  pipe  should  NOT  exceed 

twenty-five feet in length. If the steam pipe exceeds 

ten feet, use an appropriate pipe insulation rated for 

a  minimum  of  212°F.  Possible  locations  include 

Vanity, Closets, Attic (insulated), or Basement near 

bath area. The serial number plate should be visible 

and the Steam Generator should be accessible for 

service. Refer to Installation Suggestion on the page 

4.  Do  NOT  install  Generator  outdoors,  in  a  moist 

humid area, or in an area where parts may freeze or 

corrode.  Also,  do  NOT  install  near  flammable 

materials such as paints, thinners, gasoline, etc.

The  steam  line  and  safety  valve  reach  a 

temperature of 212°F during operation and should 

be appropriately protected to prevent personal injury 

by accidental contact.

1. Pre-Installation

a)

b)

c)

NOTE:

  Safety  Valve  should  be  connected  to  a 

minimum  ¾”  indirect  waste  or  as  required  by  local 

plumbing codes. In the unlikely event this valve should 

open,  the  discharge  must  be  directed  to  prevent 

damage to the home.

Water Inlet - 

A water line should be roughed-in from 

existing ½” hot or cold water pipe. Using a ½” x ⅜” 

tee, cut and solder tee into the existing water line. 

(See  Figure  3  on  page  3).  Solder  a  piece  of  ⅜” 

copper tubing into tee. Rough-in for water supply is 

now complete.

Steam  Outlet  - 

Rough-in  the  steam  line  using  a 

minimum of a ¾” copper or brass pipe, do NOT use 

black iron or galvanized pipe, it will rust and discolor 

the wall of the steam bath. The steamhead location 

should be 18” above the shower floor or 6” above 

the rim of the bathtub,  as far from the  seating area 

as possible.

CAUTION:

  No  shut-off  valve  can  be  installed  in  the 

steam line. Do NOT create traps or valleys in this line 

which  would  trap  condensation  and  block  the  flow  of 

steam. The steam pipe should be pitched toward the 

Steam  Generator  allowing  condensation  to  run  back 

toward the Steam Generator (preferred), or toward the 

steamhead.

2. Plumbing Rough-In

Plumbing rough-in is required for the water supply and 

steam line, this should be completed before the walls 

are closed. For operation, the “SM” Steam Generator 

requires a ⅜” O.D. copper tubing to the fitting on the 

generator for water inlet and ¾” copper or brass pipe for 

steam outlet.

a)

b)

- 1 -

Optional Auto

Drain Installed

Water Inlet

⅜“ Compression

Fitting

¾“Safety 

Relief Valve

¾“ Steam

Outlet

Electrical

Panel Cover

Knock-outs for

Electrical Supply Line

Knock-out for

Control Cable

Figure 1

Steam Generator

Install Upright and Level

Summary of Contents for SM-12

Page 1: ...al application or for anything other than a residential steambath installation All electrical connections must be performed by a licensed electrician in accordance with Local and National Electric Codes Steambath Generators C US LISTED 995C The Steamist SM generator operates with one or two controls appropriately located inside and or outside the steamroom It s small enough in size to be tucked aw...

Page 2: ...h selected temperature The proper voltage Steam Generator has been selected i e 208V or 240V A 208V generator operating on 240V will damage the heating element and a 240V Generator operating on 208V will result in a 25 loss of power The Steam Generator is installed in an upright position The proper sized 90 C wire and circuit breaker have been used The circuit breaker is NOT a GFI Ground Fault Int...

Page 3: ...rage rating as required Outside Installation TC 110 or DSP Timer Only Control Cable Route from Control to Steam Generator in a conduit Figure 3 Typical installation Appropriately fuse protected 208 240V field wiring to Steam generator TC 135 DSC 425 and DSP Temperature Control MUST be installed inside the shower Inside Installation Control should be mounted four feet from the floor Select a locati...

Page 4: ...oltage Multi Conductor Cable Typical Steamist Control P14 P12 P11 P16 P15 P10 P1 P2 P6 P8 P7 P9 P4 P3 P5 L H XL P18 P17 DS1 DS2 DS3 DS4 See Chart Test Switch BLU WHT GREY Water Solenoid Valve Terminal Block Optional Auto Drain Valve GRN Heating Elements Water Level Probe Fuse 0 15 AMP SM 12 15 THREE PHASE SCHEMATIC P13 GND Auto Drain Sensor BLU COIL GND BLK BLK BLK YEL BRN ORG ORG BLK BLK RED BLK ...

Page 5: ...n a moist humid area or in an area where parts may freeze or corrode Also do NOT install near flammable materials such as paints thinners gasoline etc The steam line and safety valve reach a temperature of 212 F during operation and should be appropriately protected to prevent personal injury by accidental contact 1 Pre Installation a b c NOTE Safety Valve should be connected to a minimum indirect...

Page 6: ...orm a water tight seal Escutcheon Steamhead Tighten the screw to the steamhead with the screw to face down Installation Instruction for Steamhead Escutcheon 1 2 3 4 5 Be sure the steam pipe is installed with the proper length pipe protruding through the wall Apply silicone sealant around the pipe to seal the pipe to the wall Slip the Escutcheon over the steamhead loosely Screw on the steamhead mak...

Page 7: ...ct waste or as required by Local Codes Outside Installation TC 110 or DSP Timer Only TC 135 DSC 425 and DSP Temperature Control MUST be installed inside the Steam Room WARNING When installing the Steamist Unit in conjunction with an acrylic modular tub shower unit please consult the manufacturer of the module for location of the steamhead Steam Outlet Pipe Use a minimum of a Copper or Brass pipe C...

Page 8: ...alled INDOORS in a DRY NON FREEZING location away from flammable materials such as Gasoline Paints Thinners Etc IMPORTANT Steam Generator must be installed upright and level SPECIFICATION CHART 6 4 12 240 208 8 8 70 80 40 45 Model No Max Cu Ft For Area Up To KW Volt Phase Amps Wire Size 90ºC Copper AWG Line Fuse SM 12 450 240 208 1 1 3 3 50 58 29 33 SM 15 550 15 240 208 240 208 1 1 3 3 63 72 36 42...

Page 9: ...s of two 15 kilowatt Steam Generators therefore reference Specification Chart below Master Slave Interconnection The only common connection between the Master Slave generators is as follows Connect the cable supplied with Slave Unit from Telco receptacle at Slave Unit to same at the Master Unit See diagram on back Control Connection The controls are to be connected to the Master Generator as descr...

Page 10: ... for this application Each generator requires it s own steamhead When a system is purchased you receive 2 steamheads 1 with the control and 1 with the slave generator You must not install these steamheads any closer than 6 Steamheads must be 18 from the finished floor or 6 above the rim of the tub 2 07 07 Pub No 563 C East Coast Office 275 Veterans Blvd Rutherford NJ 07070 Tel 800 577 6478 Fax 201...

Page 11: ... 7 SM 8 SM 11 SM 12 SM 15 System 18 System 24 and System 30 The Steamist InstaMist generators feature pre heat function which provides a generous volume of steam in under a minute This new feature maintains an average water temperature of 180 F in the stainless steel reservior When the steam generator is activated the pre heated water inside the steam generator quickly reaches the boiling point al...

Reviews: