Rev 3/2012
28 |
P a g e
Steam Generator Cleaning
Remove the cover of the cleaning liquid inlet
and input around 1L of citric or acetic acid.
Start the steam function to fill the steam
generator with water. Stop the steam
function before the steam starts to come out
(acid steam is detrimental to plated parts. If
a lot of acid steam comes out, the plated
parts can become cloudy after some time.).
Do not shut off the control system. The
scale in the steam generator dissolves in
acid liquid and the system drains the dirty
water out after 60 minutes. Clean the steam
generator every 3 months.
Trouble Shooting for Steam Cabin
Summary of Contents for WS-112
Page 4: ...Rev 3 2012 4 P a g e ...
Page 11: ...Rev 3 2012 11 P a g e Install the front fixed glass ...
Page 12: ...Rev 3 2012 12 P a g e Install the glass door with hinges ...
Page 13: ...Rev 3 2012 13 P a g e Install the door handle adjustable handheld shower bar ...
Page 15: ...Rev 3 2012 15 P a g e Install the aluminum trim ...
Page 19: ...Rev 3 2012 19 P a g e Electrical Diagram for Control Box ...
Page 20: ...Rev 3 2012 20 P a g e S6 Wiring Diagram ...
Page 27: ...Rev 3 2012 27 P a g e ...
Page 29: ...Rev 3 2012 29 P a g e ...