Rev 3/2012
2 |
P a g e
Table of Contents
Part 1
Installation Manual
……………………………………………
3 – 15
Cleaning & Maintenance ……………………………………………
16
Part 2
S6 Operations Manual
a.
Safety Notes
……………………………………………
17
b.
Parameter for Steam Cabin ………………………….
17
c.
Control Box Electrical Diagram
…………………
18
d.
S6 Wiring Diagram
………………………..…………
19
e.
Control Diagram
……..……………………………
20-21
f.
Operation Instructions ……..……………………………
22-25
g.
Wireless FM Transmitter
…………………………
26
h.
Steam Generator Cleaning
…………………………
27
i.
Troubleshooting ……………………………………………
27-28
NOTICE TO INSTALLERS (if applicable)
THE FLEXIBLE DRAIN HOSE THAT IS INCLUDED WITH THIS UNIT IS FOR INSTALLATION
INTO AN OPEN FLOOR DRAIN ONLY. SUBSTITUTING THE EXISTING DRAIN SHOE FOR A
DIFFERENT ONE WILL NOT VOID THE WARRANTY AS LONG AS THERE NO DAMAGE OR
EVIDENCE OF MISUSE TO THE BASE
Note:
Within the Warranty period, please don’t take off the decals from the computer
control boxes and the steam generator without manufacturer’s permission. Please do not
maintain or change the circuit by yourself. Usually most of the problems could be
troubleshoot over the phone. When calling for service questions, please provide your model
number, serial number, Purchase Order, and type of problem you are having.
Summary of Contents for WS-112
Page 4: ...Rev 3 2012 4 P a g e ...
Page 11: ...Rev 3 2012 11 P a g e Install the front fixed glass ...
Page 12: ...Rev 3 2012 12 P a g e Install the glass door with hinges ...
Page 13: ...Rev 3 2012 13 P a g e Install the door handle adjustable handheld shower bar ...
Page 15: ...Rev 3 2012 15 P a g e Install the aluminum trim ...
Page 19: ...Rev 3 2012 19 P a g e Electrical Diagram for Control Box ...
Page 20: ...Rev 3 2012 20 P a g e S6 Wiring Diagram ...
Page 27: ...Rev 3 2012 27 P a g e ...
Page 29: ...Rev 3 2012 29 P a g e ...