
STATUS SCIENTIFIC CONTROLS
Installation, Commissioning & Routine Gas Testing
FGD10B Pellistor Gas Detector
TD18/008
Issue:
10
Change Note:
1904
Page 37
Step 7
Place the pellistor sensor board onto the pellistor sensor pins and fix the
pellistor main board into position.
Step 8
Replace cover and fully tighten.