INSTALLATION SEQUENCE

For installations in the City of Los Angeles, California Category IV PVC Pipe
such as that manufactured by Brownline Pipe Company, must be used as
vent pipe material

 

CAUTION

Vent terminals supplied with the heater must be used.

NOTE:  BEFORE BEGINNING INSTALLATION OF ANY VENT PIPE READ THE
VENT PIPE MANUFACTURER'S INSTALLATION INSTRUCTIONS.

1. After the points of termination have been determined, use the cover

plates as templates to mark the holes for the vent pipes to be inserted
through the wall.  BEWARE OF CONCEALED WIRING AND PIPING INSIDE
OF WALL.

2. If the vent terminals are being installed on the outside of a finished wall,

it may be easier to mark both the inside and outside wall. Align the holes
by drilling a hole through the center of the template from the inside
through to the outside. The template can now be positioned on the
outside wall using the drilled holes as a centering point for the template.

3. A) MASONRY SIDE WALLS

Chisel an opening approximately 1/2" (1.3 cm) larger than the marked
circle.

B) WOODEN SIDE WALLS
Drill a pilot hole approximately one quarter inch outside of the marked
circle. This pilot hole is used as a starting point for a saws-all or sabre
saw blade. Cut around the marked circle staying approximately one
quarter inch outside of the line. (This will allow the vent pipe to easily
slide through the opening. The resulting gap will be covered by the vent

terminal cover plates.) Repeat this step on the inside wall if necessary.

4. Cut a length of 3" PVC pipe about 3.5" (8.9 cm) longer than the wall

thickness at the opening.

5. Glue the intake vent terminal to the section of the pipe.

6. Slide the wall plate over the pipe to stop against intake vent terminal.

7. Place a bead of caulking (not supplied) around the gap between the

pipe and the wall. Place some of the caulking on the back of the plate to
hold it against the wall after installation.

8. If the vent pipe is installed up to the wall, with a coupling on the end

against the wall opening, the pipe with the vent terminal can be prepared
for gluing before inserting through the wall. Slide the pipe through the
wall and insert into coupling on the other side of the wall, making sure
that the vent terminal ends up pointed in the correct position
(Figure 10)

.

VERTICAL  VENT  TERMINAL INSTALLATION

IMPORTANT

WHEN TERMINATING THROUGH A ROOF, THE FOLLOWING SPECIFICATIONS
PERTAINING TO TERMINAL LOCATION MUST BE FOLLOWED.

1 . Proper support must be provided for all pipe protruding through

the roof.

2. The vertical roof terminations should be sealed with a plumbing roof

boot or equivalent flashing.

FIGURE 10

INTAKE VENT TERMINAL - SUF 60 120

MODELS ONLY

INTAKE VENT TERMINAL - SUF 100 240

MODELS ONLY

EXHAUST VENT TERMINAL - ALL MODELS

INTAKE VENT TERMINAL - SUF 100 150/199

MODELS ONLY

Summary of Contents for SUF 100 150NE

Page 1: ...any phone in your building Immediately call your gas supplier from a neighbor s phone Follow the gas supplier s instructions If you cannot reach your gas supplier call the fire department Installation...

Page 2: ...SI Z21 10 3 CSA 4 3 as an automatic circulating tank water heater and automatic storage water heaters Detailed installation diagrams are found in this manual These diagrams will serve to provide the i...

Page 3: ...ON 29 TROUBLESHOOTING 29 30 REPLACEMENTPARTS 30 LIMITED WARRANTY 31 FEATURES IMPORTANT ITIS REQUIREDTHATAQUALIFIED SERVICETECHNICIAN PERFORM THE INITIALFIRING OF THE HEATER ATTHIS TIME THE USER SHOULD...

Page 4: ...MAN IN THE FIELD INVOLVED PLUMBING AIR SUPPLY VENTING GAS SUPPLY AND ELECTRICAL WORKARE REQUIRED INSULATION BLANKETS Insulation blankets available to the general public for external use on gas water h...

Page 5: ...d it is recommended that a suitable drain pan adequately drained be installed under the appliance Water heater life depends upon water quality water pressure and the environment in which the water hea...

Page 6: ...t system must terminate so that proper clearances are maintained as cited in local codes or the latest edition of the ANSI Z223 1 NFPA 54 1 Do not terminate the exhaust vent terminal over public area...

Page 7: ...7 FIGURE 5 NOTE SUF 100 240 USES TEE ON AIR INTAKE TERMINAL DIRECT VENT HORIZONTAL VENT FIGURE 6...

Page 8: ...y air inlet into building 4 The manufacturer also recommends the vent system terminations not be installed closer than 3 91cm from an inside corner of an L shaped structure And not less than 1 30 5 cm...

Page 9: ...de of the line This will allow the vent pipe to easily slide through the opening The resulting gap will be covered by the vent terminal cover plates Repeat this step on the inside wall if necessary 4...

Page 10: ...nt pipes to be inserted through the roof 2 Drill a pilot hole approximately 1 4 6 mm outside of the marked circle This pilot hole is used as a starting point for a saws all or sabre saw blade Cut arou...

Page 11: ...ivalent feet 15 2 m of three inch PVC vent pipe on the intake Also verify that the intake and intake vent terminal is free of obstructions that may prevent air from entering the unit 3 4 inch PVC may...

Page 12: ...HR FEET 1 2 3 4 1 1 1 4 1 1 2 2 2 1 2 3 4 10 175 360 680 1400 2100 3960 6300 11000 23000 20 120 250 485 950 1460 2750 4360 7700 15800 30 97 200 375 770 1180 2200 3520 6250 12800 40 82 170 320 660 990...

Page 13: ...heater as well as the requirements of all other gas fired equipment supplied by the meter If the gas meter is too small ask the gas company to install a larger meter having adequate capacity GAS PRES...

Page 14: ...WITH WATER NOTE This controller is Polarity Sensitive If the Hot and Neutral Supply Voltage is reversed the controller will not sense flame Verify polarity before connecting the unit WATER LINE CONNE...

Page 15: ...tep 2 and repeat the entire operating cycle SELF DIAGNOSTIC CONTROLLER A green LED is mounted on the Main Control Board to indicate line voltage polarity is properly connected The green LED is mounted...

Page 16: ...ame probe faulty 4 Replace flame probe 5 Gas shut off 5 Turn on gas supply 6 Clogged gas valve 6 Replace gas valve 7 Faulty gas valve 7 Replace gas valve 8 Defective control 8 Replace control 9 Burner...

Page 17: ...trol problem 2 Water in tank above freezing 2 Temperature probe out of tolerance replace temp probe PossibleCause Remedy 1 Water in tank is low probe 1 Fill tank immersed in steam 2 Probe wiring short...

Page 18: ...heck to ensure the unit is equipped with the correct orifice PRIOR TO START UP REQUIRED ABILITY INSTALLATION OR SERVICE OF THIS WATER HEATER REQUIRESABILITY EQUIVALENT TO THAT OF A LICENSED TRADESMAN...

Page 19: ...19 FORYOUR SAFETYREAD BEFORE OPERATING WARNING If you do not follow these instructions exactly a fire or explosion may result causing property damage personal injury or loss of life...

Page 20: ...ING SUF HEATERSARE CERTIFIED FOR USE WITHOUT MODIFICATION FOR ALTITUDES UP TO 6500 FEET INSTALLATIONSABOVE 6500 FEET MAY REQUIREREPLACEMENTOFTHEBURNERORIFICE CALLTHETECHNICAL CENTER 800 527 1953 FOR R...

Page 21: ...ished flushing 4 Turn on the heater electrical disconnect switch DRAINING The heater must be drained if it is to be shut down and exposed to freezing temperatures Maintenance and service procedures ma...

Page 22: ...ration and a tank explosion In areas with poor water conditions it may be necessary to inspect the T P valve more often than every three years CAUTION BEFORE MANUALLY OPERATING THE VALVE MAKE SURE THA...

Page 23: ...T WATER SUPPLIED TO FIXTURES PIPE TO OPEN DRAIN INSTALLINACCORDANCE WITH LOCAL CODES CAUTION IF BUILDING COLD WATER SUPPLY HAS A BACK FLOW PREVENTER CHECK VALVEORWATERMETERWITH CHECK VALVE PROVISIONS...

Page 24: ...R TEMPERATURE SETTING SHOULD NOT EXCEED SAFE TEMPERATURE AT FIXTURES SEE WATER TEMPERATURE CONTROL WARNING ON PAGE 3 IF HIGHER PREHEAT TEMPERATURES ARE NECESSARY TO OBTAIN ADEQUATE BOOSTER OUTPUT ADD...

Page 25: ...KIT SPECIFICATIONS PAGE28 CAUTION IF BUILDING COLD WATER SUPPLY HAS A BACK FLOW PREVENTER CHECK VALVE OR WATER METER WITH CHECK VALVE PROVISIONS FORTHERMALEXPANSION OF WATER IN THE HOT WATER SYSTEM MU...

Page 26: ...ECTCIRCULATINGLINEOF180 F 82 C ORBOOSTEDWATER IF USED TO INLETWATER LINETO BOOSTER INSTALLINACCORDANCE WITH LOCALCODES TWO TEMPERATURE TWO HEATERS ONE PRE HEATER ONE BOOSTER HEATER WITH OR WITHOUT BUI...

Page 27: ...HETANK NOTE4 IFTEMPEREDWATERISRECIRCULATED RETURNLINESHOULD BE CONNECTEDATPOINTA DANGER TEMPERATURESETTINGSHOULDNOTEXCEEDSAFETEMPERATUREAT FIXTURES SEE WATERTEMPERATURE CONTROLWARNING ON PAGE 3 IF HIG...

Page 28: ...heating and storage potential of the system cannot be achieved Plus the units with the higher water flow may have a shortened life Unions shown in piping diagrams are not included in the manifold kit...

Page 29: ...SUSPECTED 1 Check to see if the water heater drain valve is tightly closed Also check the cleanout opening for leakage 2 The apparent leakage may be condensation which forms on cool surfaces of the he...

Page 30: ...5 kPa W C or lower than the minimal gas supply pressure as shown in Table 4 that is for Natural Gas 5 0 1 25 kPa W C for SUF 120 240 or 4 5 1 1 kPa W C for SUF 150 199 or for L P Gas 11 0 2 74 kPa W C...

Page 31: ...31...

Page 32: ...32 500 LIndahl Parkway Ashland City TN 37015 Phone 1 800 821 2017 Fax 1 800 644 9306 www stateind com...

Reviews: