3
2M-Z21667 Re
v
C
Owner
’s Manual for SCT4000 and SCT4000E Contact T
oaster
FOLDING OUT CONVEYORS
THESE PARTS GET VERY HOT WHILE IN USE, SO PLEASE
MAKE CERTAIN THAT THE UNIT HAS COOLED BEFORE
ATTEMPTING THE BELOW PROCEDURES. IF THERE IS
AN IMMEDIATE NEED TO PERFORM THIS PROCEDURE
WHILE THE UNIT IS STILL HOT, MAKE CERTAIN TO WEAR
APPROPRIATE THERMAL PROTECTION.
i.
The outer conveyor cover on the front and back fold down
by lifting up on the cover and pulling outward from the top
so that the cover swings down on its pivot point.
ii.
Once the cover has been folded down, one side of the
conveyor on each side will be visible. In order to rotate
the conveyor[s] down, pull the conveyor outward.
iii.
At this time, you will be able to view the other side of the
belt and the platen/PTFE sheet as well.
iv.
Once you have finished cleaning/inspecting the unit, fold
the conveyor assemblies up first, ensuring they lock into
the proper place.
vi.
Finally rotate the covers back up and lock them in place.
At this time the toaster would be ready to use again.
BUN HEIGHT ADJUSTMENT KNOB
Bun height adjustment controlled with a simple knob in six steps ranging from [setting 1] 0.3125 in. (8 mm)
to [setting 6] 1.075 in. (27 mm) [adjusted independently front and rear]. Simply push the knob in to release
it from the current position, slide up or down to the desired position, and release the handle to lock into the
desired slot.
PTFE [NON-STICK] SHEET REPLACEMENT
The PTFE sheet is secured with two tabs on the front and two on the back. With the conveyors up,
they will be accessible from the bottom. Simply pull the sheet off of two tabs to release the tension
on the sheet, then pull the sheet off the other tabs. Lift the sheet off from the top of the unit. Place
the new sheet in position and clip over one set of tabs. Gently pull the other side and slip the slots
on it over the other tabs. Once the sheet is over all the tabs, the process is complete.