Insert the Connection Tube to
the Ceiling Plate,and align the
Ceiling Plate and the connection
tube , insert 3 bolts(N) through
the washers and tighten nut
with a spanner.
Insert the Extension Tube to
the Connection Tube,align
Extension Tube to the
Connection Tube,insert 1
bolt(N) through the washers
and tighten nut with a spanner.
Tools Required :
Summary of Contents for PJMM-2465C
Page 1: ......
Page 2: ...10 The Wall the Projector will be mounted on is either concrete or dry wall with wood studs...
Page 10: ......
Page 11: ......