![Stanley OISIN MK II Installation And Operation Instructions Manual Download Page 11](http://html1.mh-extra.com/html/stanley/oisin-mk-ii/oisin-mk-ii_installation-and-operation-instructions-manual_1361095011.webp)
1.
Before positioning the coals in the com-
bustion chamber, check for dust particles
and grime, vacuum if necessary. Position
the coals as per instructions as incorrect
placement will effect the performance of
the stove. Dust off the inside of the door
glass using a clean dry cloth. (see Fig.24)
2.
Lay the gasket material provided, on the
burner with the holes in the burner lined up
with the holes in the gasket.
3.
Lay the ceramic matrix on the burner with
the holes in the burner lined up with the
holes in the ceramic. (see Fig. 25)
10
Note:
Exhibit care when cleaning the burner to
avoid blockage or damage of burner parts.
Fig.24
Fig.25
4.
Place 4 medium coals on the front of the
matrix with their corners touching and also
one corner of each coal resting on a spar.
(see Fig.26)
Fig.26
6.
Place 3 small coals on 3 of the medium
coals leaving one corner of the small coal
touch the large coals. Place the last small
coal on either side of the matrix. (See
Fig.28)
5.
Place 4 large coals on the rear of the
matrix with their corners touching. The
front corner should over hang the back
section of the matrix by approximately
10mm. (See Fig. 27)
10mm
Fig.27
7.
Place a medium coal on the medium coal
which does not already have a small coal
on top of it. Ensure one corner of the
medium coal rests against the large coal
behind it. Lay the two remaining medium
coals randomly on the matrix ensuring that
no more than one corner of the coals touch
any other coal. (See Fig. 29)
Fig.28