SEE FIG. 8
1.
Open the burner access door. Remove door and put in
a safe place.
2.
Remove 2 inner panel securing screws and remove
panel.
SEE FIG. 9
1. Route 10mm copper oil feed pipe through left hand
side grommet and into the base of the appliance.
2. Connect to 10mm compression bulkhead fitting.
NOTE: When using two-pipe system knit order kit
number - R09M 998550.
3. Route second pipe as first.
SEE FIG. 9
1. Route fire valve capillary through grommet on left hand
side panel and clip into the 2 clips provided.
2. Ensure that the fire valve is routed to allow free
removal of the burner assembly.
SEE FIG. 10
1.
Route all electrical cables through top grommet in the
left hand side panel.
2. Make electrical connections to terminal strip as wiring
diagram.
3. Secure using cable clamp provided.
Commissioning Instructions
16
BURNER ACCESS
FIG. 8
DESN 514813
FIG. 9
DESN 514840
ELECTRICAL CONNECTION
OIL CONNECTION
FIG. 10
FIRE VALVE
DESN 514839
Summary of Contents for Alpha 120K
Page 13: ...13 Site requirements FIG 6 External wiring with 2 zone valves ...
Page 14: ...Site requirements 14 FIG 7 ...
Page 22: ...22 FIG 16 ...
Page 23: ...23 ...