![Stahl SolConeX8581/31 Operating Instructions Manual Download Page 9](http://html1.mh-extra.com/html/stahl/solconex8581-31/solconex8581-31_operating-instructions-manual_1357600009.webp)
205582 / 8581615300
2014-10-10·BA00·III·en·03
Installation
9
SolConeX Switch Socket, 125 A 8581/
31
7.3 Opening / Closing the Enclosure
To open the enclosure
Loosen the cover screws.
Open the cover including the rotary handle.
To close the enclosure
Close the cover including the rotary handle.
Tighten the cover screws to the specified torque (4.5 Nm).
7.4 Mounting and Operating Position
When mounting, make sure that
the hinged cover is at the bottom, the connection chamber is on top
the device is fixed in a vertical installation position to a plane wall using three screws
(
d
6 ... 8 mm) and suitable washers
all screws and nuts have been firmly tightened.
7.5 Electrical Connection
The information given in chapter "Technical Data" must be observed.
The conductor connection must be made with particular care.
The conductor insulation must reach up to the clamping points.
Do not damage the conductor (nicking) when removing the insulation.
Select suitable cables to be used and appropriate way of installing them to ensure that
the maximum permitted conductor temperatures and the maximum permitted surface
temperature are not exceeded.
NOTICE
When explosion protected equipment is exposed to the weather, it is advis-
able to provide a protective cover or wall.
The elongated holes allow vertical and horizontal adjustment during mount-
ing.
NOTICE
A protective conductor is always required.