15
s
MOUNTING INSTRUSTIONS
5000 SERIES OWNER’S MANUAL
1.
Layout the mounting holes on the mounting surface (refer to figure below). Drill four (4) 0.93” diameter
holes and flame cut the five inch (5”) diameter hole.
2.
Lift the crane into position. Make sure the power lead and the two (2) hydraulic hoses are fed through the
five inch (5”) diameter hole.
3.
Bolt the 5000 crane to the mounting surface with four (4) 0.88” grade eight bolts and four (4) grade eight
lock nuts. Torque the 0.88” bolts to 375 foot pounds. Use of other than 0.88” grade eight bolts and lock nuts
may result in the crane breaking loose from the mounting surface when in use.
4.
It is necessary to support the boom in the stored position. The boom support should also have a place to
secure the hook in the stored position. The figure below shows a typical boom support.
View thousands of Crane Specifications on FreeCraneSpecs.com
View thousands of Crane Specifications on FreeCraneSpecs.com