8
s
MAINTENANCE
2000 SERIES OWNER’S MANUAL
Proper maintenance on a regular schedule is essential to keep the unit operating at peak efficiency.
LUBRICATION
Maintaining the proper lubrication schedule will vary with climate conditions and the amount of usage the unit
receives. The lubrication chart below is intended to serve for a normal workload and moderate weather variance.
Periods of heavy use shorten service intervals.
ITEM
WHERE
INTERVAL
LUBRICATION
PRODUCT
Winch Cable
Surface
6 Months
Light Oil
Pulley Block Pin
Grease Fitting
6 Months
Chevron Moly Grease #2
Sheave Pin
Grease Fitting
6 Months
Chevron Moly Grease #2
Boom Pivot Pin
Grease Fitting
6 Months
Chevron Moly Grease #2
Winch
(2000E & 2000R)
Permanent Sealed
None
N/A
Winch
(2000H)
Top of Winch
1 Month
Shell Spirax Gear Oil
85W/140
Slewing Ring
Grease Fitting
1 Month
Chevron Moly Grease #2
Worm Drive/Gear Mesh
(2000R)
Directly on Gears
1 Month
Mobiltac “c”, Shell
Cardium EP Silver Streak
200, Mollube Alloy 936
View thousands of Crane Specifications on FreeCraneSpecs.com
View thousands of Crane Specifications on FreeCraneSpecs.com